Moving Right Along

The Garmin G3X system set up on the bench and slowly being wired and configured

This week we made great steps toward getting all of the avionics wiring done. We now have the system on the bench and laid out how it will be in the aircraft in order that the wiring harnesses can be created and arranged neatly.

Meanwhile things are still progressing out in the shop with the rudder plugs getting close to waxing and more parts of the fuselage almost ready to bond into place.

Like what you read? Give Peter Muller a round of applause.

From a quick cheer to a standing ovation, clap to show how much you enjoyed this story.