CERLOS

zulvia
4 min readMar 22, 2020

--

CERLOS is the only environmentally friendly building material company in the world.

INTRODUCTION

In addition, in almost all cases CERLOS products are superior in performance to comparable products at a price point equal to or less expensive than their comparable. CERLOS products are made in an environmentally responsible way. Our proprietary, low-cost, low-energy process converts wood fibers and agricultural residues into high-performance building products for green building.

WHAT IS CERLOS ?

CARLOS is the only environmentally friendly building material company in the world.

CERLOS is an eco-friendly, sustainable, high-performance building material that is fire, mold, rot and insect resistant. CERLOS was born from our desire to solve four global issues: (1) agricultural/forestry waste, (2) energy shortfall, (3) hazardous building materials, and (4) environmentally unsustainable materials. As a result, it will improve the quality of life physically, financially and environmentally. CERLOS is holding a fundraiser via IEO so we can build a manufacturing facility for commercial production of CERLOS products. We welcome investment opportunities, strategic partnerships and certified representatives to join us.

CERLOS was born through their desire to solve four global problems; agricultural / forestry waste, lack of energy, dangerous and environmentally friendly building materials.

they not only overhaul agricultural or forestry waste, but are also environmentally friendly in their manufacture and application. CERLOS is available at the same price point as or less than its competitors’ products. This new and exclusive material will fundamentally change the trillion-dollar building material industry.

Cerlos’s vision and mission is

will be a global supplier of sustainable building products, which initially accelerated high-capacity manufacturing operations in North America, followed by Europe, Latin America and Asia-Pacific.

MOXY OID’s market launch product line will be siding / cladding / fascia, followed by roofing products, and then paneling, replacing competitive, yet lower stranded (OSB) planks, plywood, oriented stranded boards (OSB), medium density fiberboard and high (MDF / HDF) and other engineered wood, fiber cement, MgO plastic boards, and other composite products including drywall.

MOXY OID’S OBJECTIVES ARE:

  1. Patent applications.
  2. Select a site for establishing a high capacity manufacturing facility in the Pacific Northwest. The site should have rail and road transport access. The facility should be 60,000 to 80,000 square feet with a surrounding area of 10 to 20 acres to accommodate materials in and out. Initially, we prefer to lease the property and buildings.
  3. Using traditional media to market CERLOS products to the building material community.
  4. Use influencer marketing to bring CERLOS products to the attention of home and building owners.
  5. Introduce the CERLOS Certified Representatives program with the intent to create a strong regional and national salesforce that is trained to use and promote CERLOS products.

TOKEN INFO

● TOKEN NAME: CERLOS

● MINIMUM GOAL: $2,000,000

● FUNDRAISING GOAL: $20,800,000

● TOKEN SUPPLY: 25 MILLION TOKENS

● NOMINAL TOKEN PRICE: $1

● JURISDICTION: Labuan — Malaysia

● ASSET CLASS: Asset Backed Token

● INVESTORS RIGHT: Right to receive income linked to profits

● ACCEPTED INVESTMENT CURRENCIES: Bitcoin, Ethereum, USD, Euro, GBP

Our Roadmap

WHERE WE’VE BEEN AND WHERE WE’RE HEADED

1985
Alan Heywood (President & CTO) purchased a patent and formed C-Max Technologies International Inc.

1986–2002
Lab research and testing. The IP is developed. $12 million spent on R&D.

2002
C-Max Technologies is dissolved. Alan develops the technology as a sole proprietor.

2003–2008
Alan continues to research, focusing on sources of ingredients and process equipment. Engagement with Corvallis Tool Company of Oregan to design and manufacture a preliminary design. Further $1 Million is spent on R&D.

2010
MOXY OID is established to aid the management and commercialization of the technology. Cost: $2 Million.

2012–2017
Pilot Plant process facility is built in Holland by VDL Enabling Technologies group. High-volume production validated. $7 Million spent.

2018–2019
Preparation and development of websites and documents for funding of high-volume manufacturing facility and legal requirements. Cost is $500k.

March 2020
Pre-Sale Starts

First Quarter 2020
Begin High-Capacity design/build of manufacturing line

Second Quarter 2020
Canada/US Site Selection

Second Quarter 2021
First Employment of High-Capacity of 450 million ft2 per year in North America

To get clearer information please visit the link below:

● Website: https://cerlos.io/

● ANN Thread: http://xxxxxxxxxxxxxxxxx/

● Telegram : https://t.me/moxy_cerlos

● Whitepaper: https://cerlos.io/wp-content/uploads/2020/01/Cerlos_Whitepaper_v3.pdf

● LinkedIn: https://linkedin.com/company/moxyoid/

● Twitter: https://twitter.com/Moxy_CERLOS

● Facebook: https://www.facebook.com/MoxyMakesCerlos/

● Instagram: https://linkedin.com/company/moxyoid/

● YouTube: https://www.youtube.com/channel/UC-aWkf565-blgwQOo8AnhzQ

● Medium: https://medium.com/@moxy_cerlos

AUTHOR

username : sayonk

link profile : https://bitcointalk.org/index.php?action=profile;u=992137;sa=summary

address ETH : 0xCb617A30b895eeb5e37aB7654c6F940A7A6DDFe4

--

--