Civil Engineers Helping With Infrastructure Building

Civil engineers plan and design large construction projects like roads, bridges, airports, shopping malls, and structures on that scale. Their work involves designing the infrastructure of a country and solving any complex problems in the execution of such work. Government planning bodies consult civil engineers to check out the feasibility of any large projects they undertake and also regarding safety concerns and financial expenses. They are associated with the project right from the planning stage right up to the implementation stage. In the present day scenario with global warming and other symptoms of environmental degradation, there is the need for civil engineers to pay heed to protection of the environment when they plan projects. It is their expertise that determines the longevity of these structures.

Ensuring Strong Structures For All Civil Construction Works

Structural engineering is also a part of civil engineering; however, structural engineering is done as a specialization after getting the basic civil engineering degree. Civil engineers are in charge of the overall project supervision and designing models. Structural engineers calculate the load and the effect of natural conditions like wind and temperature on tall buildings and large infrastructure projects. They will also need to determine if the materials used for the construction of the structure are good enough to withstand wear and tear. They decide on the structural systems, the beams, steel, concrete, columns that is going to be used in a building design.

Protection From Flooding With Flood Risk Assessment

Flood risk assessments may be necessary before developing a site. This can be done by yourself if it is a small project like adding an attachment to an already existing house. The services of a flood risk specialist like civil engineering consultants may be required if there is going to be extensive development of a site. The builder will have to determine which flood zone category his site comes under, if it is in an area which is considered to have critical drainage problems. All information regarding this can be obtained from the Environment Agency and the local planning authorities. Basically flood risk assessment is to check out the risk of flooding from sources like groundwater, surface water, vadose zone, sewers or drains, artificial water like burst water mains, streams or rivers. There should be identification of what are the measures taken to mitigate the effects of a flood, and also the action plan in the event of a flood and before the flood.

Risk control by Project Managers

The project manager is responsible for the initiation and completion of the project he is in charge of. His managerial skills are essential for solving problems and resolving conflicts. He makes all the decisions necessary pertaining to the project to minimize and control risks. Financial planning, estimating costs, and developing a budget are the responsibilities of the project manager. He should also have the ability to estimate the duration of the project, so he can monitor and report progress achieved. He is also involved with people management as in dealing with vendors and people involved directly in the project.

Like what you read? Give alanwooduk a round of applause.

From a quick cheer to a standing ovation, clap to show how much you enjoyed this story.