What is 5D BIM for Construction and How it Supports the Calculation of Cost Estimates?

BIM Experts
5 min readAug 16, 2023

--

In the dynamic world of construction, where precision and efficiency are paramount, the integration of technology has transformed the landscape. One such transformative innovation is 5D Building Information Modeling. It’s a powerful tool that enhances the planning and visualization of construction projects and contributes to the calculation of cost estimates.

Cost Estimation process in 5D BIM
Cost Estimation process in 5D BIM

Understanding 5D BIM Cost Estimation Process:

Cost estimation of construction projects in 5D BIM is a crucial step in construction project management. It involves assessing and predicting the financial requirements of a project, encompassing materials, labor, equipment, overhead, and contingency.

As technology continues to advance, the construction industry stands to benefit immensely from the capabilities of BIM 5D Modeling companies.

There are many top 5D BIM Cost Estimation Services provider ensuring more accurate cost estimates and successful project outcome.

What are the Steps in the Cost Estimation Process?

5D BIM and Construction Cost Control
5D BIM and Construction Cost Control

1. Scope Definition: Clearly defining the project scope, including its goals, objectives, and deliverables.

2. Resource Identification: Identifying the resources required for the project, such as materials, labor, equipment, and subcontractors.

3. Quantity Takeoff: Measuring and quantifying the materials and components needed for the project, based on design drawings and specifications.

4. Pricing: Assigning unit costs to the quantities obtained in the takeoff stage, including material costs, labor rates, equipment rental costs, etc.

5. Cost Calculation: Multiplying quantities with their respective unit costs to calculate the total cost for each resource.

6. Overhead and Contingency: Adding overhead costs (indirect costs) and contingency allowances to the calculated costs to account for unforeseen circumstances.

7. Final Estimate: Summing up all costs to arrive at the final estimated cost of the project.

5D BIM and Its Role in Cost Estimation:

5D BIM introduces the element of time as the fifth dimension, enabling a more comprehensive understanding of the construction process. This added dimension is crucial for accurate cost estimation as it accounts for the project’s evolving stages over time.

How 5D BIM is utilized for Cost Estimation?

1. Accurate Quantity Takeoff: BIM 5D Cost Modeling enables automated and precise quantity takeoff. By integrating the 3D design model with the bill of quantities (BOQ), the software can accurately measure and quantify materials and components required, reducing human errors and inconsistencies.

2. Realistic Visualization: The 3D visual representation provided by BIM enables stakeholders to have a realistic view of the project before it’s built. This visual understanding aids in better estimating the resources needed for each stage of construction.

3. Time-Dependent Cost Analysis: BIM 5D Cost Planning incorporates the crucial element of time. This inclusion empowers comprehensive scrutiny of cost fluctuations across the project’s timeline, facilitating meticulous tracking of cost peaks and strategically informed budget management.

Utilizing the benefits of Exploring the Advantages and Difficulties of Applying Cost-Benefit Analysis to Policy Decisions.

Image Source

4. Change Management: Construction projects often undergo design changes, which can impact costs. 5D BIM helps in understanding the cost implications of design alterations by simulating the changes and adjusting the cost estimates accordingly.

Image Source

5. Collaboration and Transparency: 5D BIM promotes collaboration among different project stakeholders. When everyone has access to the same data-rich model, discussions around cost estimations become more transparent, leading to more accurate estimates.

6. Scenario Analysis: With 5D BIM, different construction scenarios can be simulated and analyzed, giving insight into how changes in construction methods or sequencing might impact costs. This proactive approach to scenario analysis aids in making well-informed decisions.

5D BIM Cost Estimating Software:

Many software programs are used for 5D BIM cost estimation. Some of the most popular options include:

  • PriMus IFC by ACCA software: This software allows users to automatically generate quantity takeoffs from BIM models saved in the IFC format. It also includes features for cost estimation, scheduling, and project management.
BIM Quantity Take Off Software: PriMus IFC

BIMSight by PlanGrid: This software provides a cloud-based platform for collaboration on BIM models. It also includes features for cost estimation, scheduling, and RFI management.

Image Source
  • BIM 360 Cost by Autodesk: This software is integrated with Autodesk BIM authoring software, such as Revit and AutoCAD. It allows users to generate quantity takeoffs and cost estimates from BIM models.
Image Source
  • Procore by Procore Technologies: This software is a cloud-based project management platform that includes features for cost estimation, scheduling, and RFI management.
  • Tekla EPM by Trimble: This software is used for cost estimation, scheduling, and project management for steel and concrete structures. It can be integrated with Tekla BIM authoring software.

Tips for choosing 5D BIM cost estimation software:

The best software for 5D BIM cost estimation will depend on the specific needs of the project. Some factors to consider include the size and complexity of the project, the experience of the users, and the budget.

  • Ensure the software is compatible with the BIM authoring software that you will be using.
  • Consider the features that are important to you, such as quantity takeoff, cost estimation, scheduling, and project management.
  • Get quotes from multiple vendors to compare prices and features.
  • Read reviews from other users to get their feedback on the software.
  • Try out the software before you buy it to make sure it meets your needs.

Final Thought:
In the ever-evolving construction industry, 5D BIM has emerged as a game-changer, bringing a new dimension of time to the traditional 3D models. This innovation not only enhances visualization and collaboration but also greatly supports the intricate process of cost estimation. By integrating accurate quantity takeoff, time-dependent cost analysis, and realistic visualization, 5D BIM empowers construction professionals to make informed decisions and manage projects with greater efficiency.

--

--

BIM Experts

I am a BIM architect, serving this domain for the last 10 years. I have acquired knowledge and skills working with top BIM modeling services company.