Everything about Exchange Order Management Module!
A very widespread and relevant problem of many cryptocurrency exchanges is the absence of the possibility to set Take Profits and Stop Losses at the same time.
We are developing a module that will help to define the levels of Take Profits and Stop-Losses, and also maximize profit from long-term trends.
The main goals that can be achieved through the use of the module:
- Maximize profitability when closing orders.
- Automatically determine levels of support and resistance.
- Finding the best places to set Take-Profits and Stop-Losses.
- Automating the process of closing and opening orders for specified user parameters.
- Possibility to set both Stop-Loss and Take-Profit simultaneously.
All operations are carried out on a separate modular server, which provides high bandwidth due to low load on a specific segment of the network infrastructure.
Now it’s time to show you how this module is going to look like!
As you can see on the picture below, it is possible to track your current orders, choose currency, its price, volume of the order, and exchanges.
And FTEC Pre-Sale is live now! You still can buy our tokens with the highest 20% discount and earn on FTEC price increasing and also using our module! 🚀
Our official websites where you can buy FTEC:
https://ftec.io
https://ftec.ai
https://ftec.tech
https://ftec.company