Become a member
Sign in
Imran Sarwar
Imran Sarwar

Imran Sarwar

1 Following
1 Followers
  • Profile
  • Claps
  • Highlights
  • Responses

Highlighted by Imran Sarwar

See more

From How to solve the Knapsack Problem with dynamic programming by Fabian Terh

…umn j, we are tackling a sub-problem consisting of items 1, 2, 3 … i with a knapsack of j capacity. There are 2 options at this point: we can either include item i or not. Therefore, we need to compare the maximum value that we can obtain with and without item i.

From How to solve the Knapsack Problem with dynamic programming by Fabian Terh

First, we create a 2-dimensional array (i.e. a table) of n + 1 rows and w + 1 columns.

Claps from Imran Sarwar

See more

How to solve the Knapsack Problem with dynamic programming

Fabian Terh

What are DoD and DoR in Scrum?

Matthias Orgler

Machine Learning week 1: Cost Function, Gradient Descent and Univariate Linear Regression

Lachlan Miller