Sand making machine installation and use of notices

Sand making machine belongs to the heavy equipment, the installation and use of all need a certain rules and instructions. The book in the installation with even more so, below we have a look at its installation and use need to pay attention to what content:
One, sand making machine installed on a concrete foundation, the foundation shall bear several times the weight of the whole machine. According to the different sand airport can be arranged homework in the workshop or is installed in the outdoor work. When installed, should be the sand making machine leveling the spindle and the horizontal and vertical. Sand making machine should be arranged above the lifting equipment, lifting equipment weight according to the sand making machine maximum weight into account, leaving the lifting space should be above the sand making machine, sand making machine should be left on the side of the appropriate space for detection with.
Two, installed in the sand scene still should conduct a comprehensive inspection. Check the lubricating oil pipe is connected firmly, trial operation before installation should be heavy with a oil, add Mobil car lubricating super or 3# grease. Check whether the lattice component lubricating oil pipe connected firmly, carefully check the impeller on whether there is a foreign body.
Three, check the motor belt, is to move the motor, rotation to be consistent with the sand making machine label directions, if the opposite direction signs, should adjust the motor wiring, the rotation direction and signs consistent direction of rotation, is strictly prohibited. Dual motor drive, motor spindle assembly and on both sides, the wind don’t have the same number of triangle belt and spindle assembly is connected, should be adjusted straight. After the check and correct after reproduction, production before the first air load test machine, the test machine to make sure there are no mistakes before production.
Four, general crusher machine rotating empty load operation time was 4 hours, load test run into the grain size strictly according to various models, specifications, strictly greater than a specified materials into; feeding is uniform and continuous, the moisture content of not less than 10 — 15% (according to different materials), feeding reached PCL straight through impact sand making machine full load so far; the load trial running time 8 to 24 hours
Five, sand making machine check vortex cavity observation door is closed, to prevent the material from the vortex cavity observation door out, danger. Check the impeller and conveying equipment boot up sequence:
1, row material, sand making machine, feed
2, sand making machine start to load, to sand making machine normal operation before feeding.
3, the shutdown sequence and boot on the contrary.
Six, sand making machine feeding size strictly according to the requirements, strictly greater than a specified material into the sand making machine, otherwise, will cause an imbalance and impeller sand making machine impeller excessive wear, even cause jams impeller passage and the center into feed tube, so that the sand making machine can not work normally, found the great material should be excluded.
Seven, vertical roller mill host stop working before, should first stop feeding, otherwise it will cause squished impeller, burn out the motor. Feeding should be uniform. Sand making machine in the process of operation, there shall be no violent vibration and abnormal noise, otherwise, should be down to check. Lubrication is a dry oil lubrication, using Mobil vehicle grease or 3# grease. Sand making machine every 100 working hours add amount of grease.
Under normal circumstances, the use of sand making machine take note of these points can be made in the use, only follow the rules of sand making machine under the condition of the operation, in order to ensure that the service life of the sand making machine, and the quality of products, and even personal safety economic loss.