July 18th: Weekly Design Links

“Washing one’s hands of the conflict between the powerful and the powerless means to side with the powerful, not to be neutral. ” ― Paulo Freire

A weekly links post on Tuesday? Yep, the times they are a changing… Also, the layout has been altered a little–nothing crazy. This is Medium after all and you can only go so far.

If you need more of these links, like every day – go to CreativeLinks.Club and sign up for the email list. You’ll get five art & design links everyday. And now, without further ado, let the links commence.

Web Design

Stealing Your Way to Original Designs • http://danmall.me/articles/stealing-your-way-to-original-designs/

Telepathy Rebrand & Redesign • https://www.dtelepathy.com/

What to follow to stay updated on design systems? • https://product-unicorn.com/what-to-follow-to-stay-updated-on-design-systems-30a330d2161f

UI

CTRL+X: Street Artists “Delete” Graffiti with a Painted Anamorphic Illusion • http://www.thisiscolossal.com/2017/07/ctrlx-street-artists-delete-graffiti-with-a-painted-anamorphic-illusion

Pepe’s Creator Is Trying to Save His Lovable Stoner Frog from the Alt-Right • https://www.artsy.net/article/artsy-editorial-pepes-creator-save-lovable-stoner-frog-alt-right

A Brief History of Polaroids in Art, From Ansel Adams to Andy Warhol (And Beyond) • https://www.artsy.net/article/artsy-editorial-history-polaroids-art-ansel-adams-andy-warhol

Graphic Design/Branding

10 Things I Learned at Typographics NYC • https://toky.com/journal/2017/07/07/typographics-nyc

Venue is a New, Oldschool Typeface for Rockers at Heart • https://medium.com/@roblevintennis/illustration-teardowns-soulful-isometrics-ed5caf0fdb71

Illustration/3D

OBSIDIAN — pitch black drawings • https://www.behance.net/gallery/53822839/OBSIDIAN-pitch-black-drawings

Illustration Teardowns: Soulful Isometrics • https://medium.com/@roblevintennis/illustration-teardowns-soulful-isometrics-ed5caf0fdb71

Recycled park • https://www.behance.net/gallery/54429903/Recycled-park

Work

Dumb Questions for Smart Designers • http://dumbquestions.co/

…and that’s all for this week