Mobile phone chargers production process, mobile phone chargers manufacturing

SV3C DEALS
2 min readSep 19, 2018

--

This article is about the mobile phone chargers production process, mobile phone chargers manufacturing

Mobile phone chargers have become indispensable electronic products in life with the popularity of smartphones. More and more manufacturers are producing mobile phone chargers.
So, how is the production of mobile phone chargers made? Yuda Electronics Co., Ltd. to discuss together.

1. After the charger is manufactured by the engineering department, the following information should be available after the manufacturing process is completed:

(1) BOM table.
(2)schematic diagram.
(3) Develop samples.
(4) Model name (named as required).
(5) Product specifications (performance indicators, system wiring diagrams).
(6)PCB board diagram

2. After receiving the information of the engineering department, the Ministry of Electronics and the Quality Department should basically complete the preparation, review, and issuance of relevant materials within two working days.

Including Write SOP. (component processing, plug-in, soldering, testing, assembly, aging, ultrasound, and packaging, etc.)

3. After the product goes online, the production technology of the Engineering Department and the Electronic Department will follow up. To conduct teaching and instruction on production processes (component processing, plug-in, soldering, testing, assembly, aging, ultrasound, and packaging, etc.), and to timely understand production conditions and handle abnormalities.
(1) For the mature technology models, the production technology of the electronic department is the main responsible person, mainly to solve the production and process problems and ensure the smooth production.
(2) For the models with very immature technology, the Engineering Department is the main responsible person, mainly to find and solve product design defects. The engineering department assists production technology solves production and process problems, and ensures smooth production.
(3) The quality department should do a good job in quality inspection.

4. All departments should promptly report to the Engineering Department the problems that arise in production.
5. For production problems, the production technology shall promptly record and fill out the “Product Production Report”.
6. Problems that can be dealt with by production technology should be dealt with promptly. Can not handle the timely feedback to the relevant departments, and follow-up with relevant departments.
7. During production, the production department of the electronics department shall timely calculate the product working hours and accessories data, and send the working hour and auxiliary materials data to the PMC within two working days after the production.
8. the market test sheet, the production department after the process OK, we must first test the market, to see where sales are more appropriate.
9. product certification, export-type mobile phone chargers to do the relevant certification abroad, the EU is generally CE certification. The US regulations are FCC/UL/ETL, South Korea is KC, Japan is PSE (principal), and domestic is 3C.

--

--