How to build a concrete based house in 30 days

Naijaspider.com
4 min readNov 11, 2023

--

Building a concrete-based house in 30 days requires careful planning, efficient organization, and adherence to a well-structured timeline. Here’s a comprehensive guide outlining the step-by-step process to achieve this ambitious goal.

**1. Preparation and Planning (Days 1–3):

a. Site Inspection:

Conduct a thorough site inspection to assess soil conditions, drainage, and potential challenges. This is especially important in flood prone areas which might need sturdier foundations to withstand the potential adverse conditions that come with such weather extremes.

b. Permits and Approvals:

Obtain all necessary permits and approvals from local authorities to ensure compliance with building codes. Remember the issues with demolitions of properties in Lagos State, and the harassment of developers by Omoniles and local touts.

c. Clearing and Excavation:

Clear the construction site of debris and begin excavation for the foundation. Ensure proper grading and drainage. Now you are ready for work.

2. Foundation (Days 4–8):

a. Formwork Installation:

Set up formwork for the foundation. Use high-quality materials for durability. Remember, different foundation types for different soil and building types e.g Raft foundations for water prone areas to avoid cracking and water seepage through the foundation

b. Rebar Placement:

Install steel reinforcement bars (rebar) within the formwork to enhance the structural integrity of the foundation. Here the iron bender becomes your best friend

c. Concrete Pouring:

Pour high-quality concrete into the formwork. Ensure it is well-mixed and meets the required strength specifications. Ensure your bricklayers and workmen are well supervised to ensure a quality concrete mix to ensure an even and strong cast.

d. Curing:

Implement a proper curing process to allow the concrete to achieve its maximum strength. This may involve applying water or curing compounds. Always employ experienced and competent contractors to get this done. Very crucial step.

3. Framing and Structure (Days 9–15):

a. Framing Installation:

As the foundation sets, begin framing the structure using pre-cut and labeled materials to streamline the process.

b. Wall Construction:

Build exterior and interior walls, ensuring proper alignment and spacing for doors and windows. This is where the skill and ingenuity of your workmen come into play. Always ensure strict adherence to architectural plans.

c. Roof Trusses:

Install roof trusses or rafters, securing them firmly to the walls. This step may require specialized equipment. Carpenter at work here.

d. Sheathing and Weatherproofing:

Apply sheathing to exterior walls and install weatherproofing materials to protect the structure from the elements. This is not a usual step in tropical countries but if you are in acid rain prone areas then consider protecting the exterior walls

4. Plumbing and Electrical (Days 16–20):

a. Rough-In Plumbing:

Install plumbing lines within the walls and floors, ensuring proper connections for sinks, toilets, and other fixtures. Very key as many houses built in Nigeria are notorious for plumbing leakages which could be very expensive and annoying to fix.

b. Rough-In Electrical:

Run electrical wiring and install outlets, switches, and fixtures. Ensure compliance with safety codes. Electricians come in here to do this part. Also for smart homes. Ensure the wiring materials are top notch and meet safety standards to avoid electrical fires.

c. Inspections:

Schedule inspections to verify that plumbing and electrical work meet building code requirements. You might need a third party to inspect the plumbing and electrical work done. Pressure testing the water pipes is recommended.

5. Exterior Finishes (Days 21–24):

a. Siding and Exterior Finishes:

Apply siding, stucco, or other chosen exterior finishes to protect the building and enhance its aesthetic appeal. Here you are spoilt for choice on how you want the exterior aesthetics to look.

b. Windows and Doors:

Install windows and doors, ensuring proper sealing to enhance energy efficiency. Aluminium windows are the top choice pick for most developers and builders.

b. Flooring Installation: (Days 25–28)

Lay flooring materials such as tiles, hardwood, or laminate.

c. Painting:

Paint interior walls and ceilings. Use high-quality paint for a durable finish. POP ceilings are in vogue for their durability and brilliance after finishing

7. Final Touches and Inspections (Days 29–30):

a. Final Inspections:

Schedule final inspections to ensure the house complies with all building codes. You might want to do this yourself to make sure all instructions were adhered to during the construction phase.

b. Landscaping:

Complete any remaining landscaping tasks, such as grading, planting, or installing walkways. You might want to call on reputable cleaning and landscaping contractors to ensure a professional touch to your environment.

c. Final Clean-Up:

Conduct a thorough clean-up of the construction site to ensure it is safe and presentable. Most times the landscaping contractor undertakes the site cleaning to ensure work completeness.

Building a concrete-based house in 30 days is an ambitious goal that requires meticulous planning, skilled labor, and efficient project management. It is crucial to work closely with experienced professionals and building contractors to ensure adherence to local building regulations for a successful and safe construction process. While this timeline provides a general overview, adaptability and contingency planning are essential to address unexpected challenges that may arise during the construction process.

--

--