Why Design Built Structures are a Must in Any Construction Project?
The construction industry is a booming industry, and it will continue to flourish in the next coming years. Thus, when you incorporate new methods like design-build structures, you can effectively implement various building strategies.
With time there are multiple things that are evolving. There are various techniques to do so, be it making a new website or making a new building. Things are developing day by day. For automation, it is a new electric car. For technology, it had been the touch screen. Lastly, for the construction, it is the design of built structures. The concept of design-built structure is the same construction project taken by the same company known as the ‘design builder’ or ‘design-build contractor.’
What is wrong with the old form of constructing a building?
Have you ever worked on a construction project where everyone worked in silos, and a slew of conflicts arose when the ground was broken? With so many parties involved, a lack of coordination and planning might result in big problems down the road. The most significant distinction between design-build and traditional construction methods is early engagement. Once the building design is finalized in a standard project, the developers employ a general contractor. Conflicts and inconsistencies are only found once building begins, and trade specialists come on site. This frequently results in finger-pointing, significant cost overruns, and lengthy delays. A lack of transparency and collaboration is the major fault here. The usual design-build process is turned on its head with design-build.
The process of unfolding a design-build project
When you choose a design-build strategy, every specialist joins at the “napkin sketch” stage, which is when an architect has done a basic draught of the plans, but nothing has been finalized. The early emphasis on value engineering is what actually distinguishes this methodology.
Let us evaluate each stage step by step
Get all the hands-on-deck
A design-build project is a highly impactful project where the developer, engineers, contractors, and architects join hands together to execute a construction project to its final stage. First, various plans are created to analyze the potential pros and cons, and then the most suitable method is taken into consideration. Everyone combines their knowledge so that they face lesser conflicts down the road.
Determining the potential issues before they can take place
For design-built structures, the team sits and reviews even the rough designs repeatedly to figure out any potential issues that might exist. Analyzing them is a crucial step as if any noteworthy problem arises, it can affect the entire budget of the construction project. If a clash is identified in the initial stage, potential solutions can be brought up immediately.
Maintaining synergy onsite with the use of LPS
The Last Planner System (LPS) is a day-to-day scheduling method done by the general contractor, subcontractor, and trades design together. This degree of granularity gives each team a clear picture of their daily tasks and deadlines. The method LPS is deliberately included as it can bring out the root of the cause in detail while facilitating quick preventive measures that are proper and accurate, in the right places wherever and whenever required.