Adam Sobotka
1 min readOct 12, 2017

--

I understand importance of figuring out bottlenecks in system (system limits), but in Kanban we simply use these as a WIP limits right? So in pull system, you should have a WIP limit set to the “takt” of the system.

Not sure that I understood the article right though.

--

--