Workable vs Feasible: Choosing the Best for Your Project

Workable
4 min readAug 3, 2024

--

Alright, let’s dive into the nitty-gritty of the terms workable and feasible — two words that, while often used interchangeably, are as different as night and day (or more like a caffeine-fueled brainstorm vs. a well-researched thesis). You’ve probably heard these terms tossed around in meetings, project plans, and those dreaded email threads that somehow turn into existential crises. But what do they really mean, and why does it matter if your project is workable or feasible? Grab your coffee, and let’s unravel this together.

Workable Defined

Picture this: You’ve got a grand idea — maybe it’s a new app that lets dogs order their own food (hey, it could happen). A workable plan is like a “let’s give this a shot” approach. It means that with the resources you currently have, you can actually make your idea come to life — at least in some form.

Characteristics of a Workable Plan

  1. Immediate Action: You can start right away. The plan doesn’t require too many hoops to jump through before you can get started.
  2. Resource Alignment: The necessary resources — people, technology, or time — are already at your disposal.
  3. Flexibility: Workable plans are often flexible and can adapt as new information comes in.

Examples of Workable Ideas

  • Launching a small-scale marketing campaign with the existing team and budget.
  • Creating a new feature for an app that doesn’t require overhauling the entire system.
  • Starting a blog series with a single writer and a modest content plan.

🚀 Discover Workable: Schedule a free trial demo to elevate your hiring strategy! 📈

Feasible Defined

Now, let’s talk feasibility. This term is a bit more hardcore — it’s about whether your idea is practically achievable considering various constraints. Feasibility isn’t just about getting things off the ground; it’s about ensuring that the entire journey from concept to completion makes sense.

Characteristics of a Feasible Plan

  1. Resource Sufficiency: You have or can obtain all the necessary resources, including time, money, and expertise.
  2. Risk Management: The risks involved are manageable or can be mitigated effectively.
  3. Long-Term Viability: The plan not only works now but also stands the test of time.

Examples of Feasible Projects

  • Developing a new product line that aligns with market trends and has solid funding.
  • Opening a new branch of your business in a location with proven demand and infrastructure.
  • Implementing a large-scale software upgrade with a clear roadmap and allocated budget.

Key Differences Between Workable and Feasible

So, how do you separate the wheat from the chaff? Here’s where the rubber meets the road. The difference between workable and feasible boils down to several key aspects:

  1. Resource Availability:
  • Workable: You can make it happen with what you’ve got.
  • Feasible: You need to ensure all necessary resources are not only available but also sustainable.

🛠️ Unlock Workable’s potential! Get a tailored demo and see hiring magic. 💼

  1. Time Constraints:
  • Workable: You can start quickly, and there’s room for adjustment.
  • Feasible: It needs to fit within a realistic timeline, considering all phases of the project.
  1. Risk Assessment:
  • Workable: You can manage risks as they come up, often with some flexibility.
  • Feasible: Risks are accounted for in the planning stage, with strategies to handle them effectively.
  1. Cost Analysis:
  • Workable: Costs are manageable and fit within the existing budget.
  • Feasible: The project is economically viable over its entire lifecycle, with detailed cost projections and financial backing.

How to Determine Workability and Feasibility

So, you’re at a crossroads, deciding whether your latest brainchild is workable or feasible. Here’s your roadmap:

  1. Evaluation Process:
  • For workability, assess if the project can be kicked off with current resources and whether it can be adjusted based on feedback.
  • For feasibility, analyze whether the project aligns with long-term goals, budget, and risk management strategies.
  1. Factors to Consider:
  • Workability: Resources on hand, immediate needs, and adaptability.
  • Feasibility: Comprehensive resource assessment, long-term sustainability, and strategic alignment.

👩‍💼 Explore Workable now! Enjoy a free trial and see how we transform hiring. 🔧

Conclusion

Alright, to sum it up: workable is about whether you can make things happen right now with what you’ve got, while feasible is a deeper dive into whether your idea can thrive in the long run, given all possible constraints. Understanding this difference isn’t just useful — it’s essential. Imagine trying to launch a rocket with just a slingshot. It’s workable if you’re aiming for a short distance, but it’s hardly feasible for interstellar travel.

So next time you’re in a meeting and someone throws around these terms, you’ll know whether they’re talking about a quick fix or a long-haul journey. Remember, both concepts are crucial, but knowing which one applies can save you from a lot of headaches (and possibly keep your dog-food app from becoming a sad joke). Keep your projects grounded in reality and your eyes on the stars — just make sure you’ve got the right plan for each!

Until next time, keep optimizing and don’t forget to laugh at the absurdities of the business world. After all, if we can’t have a bit of fun with this stuff, what’s the point?

--

--

Workable

A better way to recruit and manage successful teams. Find, hire, onboard, and manage the right person for every job.