What conditions should be met for the construction of PVC concrete plastic formwork of the main body

cuip
1 min readJul 22, 2022

--

When we wholesale PVC concrete plastic formwork, we should consider many factors, and before the construction of the main formwork, we should consider many issues according to the construction period, quality and safety requirements.

When selecting materials, strive to be common, reusable and convenient for maintenance. It is necessary to fully meet the expected safety and durability under the specified conditions and within the specified application period. For the structural design of formwork and its support, the structure should be safe and reliable, and the cost should be economic and reasonable. When selecting the structure, we should strive to ensure that the stress is clear, the structural measures are in place, the lifting and erection are convenient, and the inspection and acceptance are convenient. In addition, the erection of formwork and formwork support must comply with relevant standards.

Before installation, the positioning datum of the formwork should also be done well, including the axis, the inner edge line and center line of the formwork. The position of the quick disassembly head should be marked on the formwork, and the preliminary preparations for the leveling of the installation surface should be made.

forward from:https://www.jzslmb.cn/

--

--

cuip
0 Followers

Focus on sharing the best engineering solutions for PVC concrete formwork, plastic formwork, pvc concrete plastic formwork.