An ongoing, inside look at our Moses Lake facility

Dec 9th

POD 4
Hundreds and hundreds of feet of massive cables are being laid out to feed the power
POD 5 completing external electrical work
PODs 6,7,8 — all fans installed
PODs 6,7,8 transformers with HV switchgear installed
Wiring for electrical panels being pulled
PODs 6,7,8 internal cable trays and wiring for PDUs being laid out
POD 3 (left) and 4 (right)

Dec 5th

Placing transformers for PODs 6,7,8 to get wired
POD 6 internal electrical work is being done
Network and miner installation is being done
Fans installed in 6 & 7 — almost done with 8
Switchgear panels getting prepped for installation