Building an Automated Project Management System with Langgraph Supervisor and Groq deepseek-r1-distill-llama-70b
Revolutionizing Project Management with AI Agents
In today’s fast-paced development environments, manual project planning and resource allocation are becoming increasingly inefficient. This article explores how to build an automated project management system using Langgraph Supervisor and a multi-agent architecture, capable of handling task planning, estimation, and resource allocation autonomously. This system demonstrates how multiple AI agents can collaborate to handle complex project management tasks.
The Architecture: A Symphony of Specialized Agents
Our system is built on four key agents, each with specialized responsibilities:
1. Supervisor Agent: The orchestrator that oversees the entire project lifecycle
2. Task Planner Agent: Handles project breakdown and dependency analysis
3. Estimation Agent: Provides detailed effort and resource estimates
4. Resource Allocation Agent: Optimizes team assignments and workload distribution
What is Langgraph Supervisor ?
LangGraph Supervisor is a Python/JavaScript library designed for building hierarchical multi-agent systems within the LangChain ecosystem. It introduces a structured approach where a central supervisor agent orchestrates specialized worker agents to handle complex tasks. Here’s a breakdown of its core components and functionalities:
1. Core Architecture
- Hierarchical Structure:
Uses a “supervisor-worker” model where: - A supervisor agent acts as the brain, managing communication and task delegation.
- Specialized worker agents (e.g., task planners, estimators, resource allocators) handle domain-specific operations.
- Supports multi-level hierarchies (e.g., supervisors managing other supervisors).
- Tool-Based Handoff:
Agents communicate via predefined tools (e.g.,create_handoff_tool
), enabling structured data transfer and context-aware task routing. For example, a supervisor might use a tool likeassign_to_math_expert
to delegate calculations110.
2. Key Features
- Centralized Orchestration:
The supervisor dynamically routes tasks based on context (e.g., using LLM logic or predefined rules). - Flexible Memory Management:
Supports both short-term (in-memory checkpoints) and long-term memory (persistent stores) for conversation tracking110. - Customizable Workflows:
Developers can define custom handoff tools, modify message routing logic, and integrate external APIs (e.g., web search, database queries)17.
3. Technical Components
- StateGraph Integration:
Built on LangGraph’sStateGraph
for managing agent states and transitions, allowing cyclical workflows (e.g., iterative task refinement). - Prebuilt Agents:
Includes utilities likecreate_react_agent
to quickly build agents with tools and prompts. Example:
research_agent = create_react_agent(
model=model,
tools=[web_search],
name="research_expert",
prompt="You are a world-class researcher..."
)
- Cross-Language Support:
Available for both Python (langgraph-supervisor
) and JavaScript (@langchain/langgraph-supervisor
)
Code Implementation
- Install Required Libraries
%pip install -qU langchain langchain-core langchain-groq langchain-community langchain-openai langgraph-supervisor langgraph
2. Setup Required API keys(Implemented on Colab)
from google.colab import userdata
import os
os.environ["GROQ_API_KEY"] = userdata.get('GROQ_API_KEY')
3. Setup LLM
from langchain_groq import ChatGroq
groq_model=ChatGroq(model="deepseek-r1-distill-llama-70b",temperature=0.6)
4. Define Tools
#
from langchain_core.prompts import PromptTemplate
from langchain_core.output_parsers import JsonOutputParser,StrOutputParser
#
#1. Task planning Tool
#
#
def planningTool(project_type,project_requirements,team_mbers,objective):
"""Task Planner Function tool that helps to plan tasks"""
prompt = """Carefully analyze the project requirements for the Project : {project_type} and break them down into individual tasks.
Define each task's scope in detail,set achievable timelines and ensure that all the dependencies are accounted for:
Project Objective: {objective}
Project Requirement:
{project_requirements}
Team Members:
{team_members}
The final output should be a comprehensive list of taks with detailed scope,timelines,description,dependencies and deliverables.
Your final OUTPUT must include a Gnatt Chart or similar timeline visualization specific to {project_type} project.
"""
final_prompt = PromptTemplate(input_variables=["project_type","project_requirements","team_members","objective"],template=prompt)
chain = final_prompt | groq_model | StrOutputParser()
response = chain.invoke({"project_type":project_type,"project_requirements":project_requirements,"team_members":team_mbers,"objective":objective})
return response
#2. Estimation Planning Tool
#
def estimationTool(project_type):
"""Resource and Time Estimation Function tool that helps to estimate time,resources and effort reuired to complete a project"""
prompt = """Thoroughly evaluate each task in the {project_type} to estimate time,resources and effort reuired to complete the project.
Use hiostorical data,task,complexity and available resources to provide a realistic estimate.
The Output should be a detailed estimation report outlining the time,resources and effort required for each task in the {project_type} project.
Take into consideration the report from the Task Planner Function tool.The report MUST include a summary of any risks or uncertainties with the estimations encountered during the estimation process.
"""
final_prompt = PromptTemplate(input_variables=["project_type"],template=prompt)
chain = final_prompt | groq_model | StrOutputParser()
response = chain.invoke({"project_type":project_type})
return response
#
# 3. Resource allocation Planning Tool
#
def resourceAllocationTool(project_type,industry):
"""Resource Allocation Function tool that helps to manage resources based on skills and availability"""
prompt = """With a deep understanding of the team dynamics and resource management in {industry},you have a track record of
ensuring that the right person is always assigned to the right task.Your startegic thinking ensures that the {project_type} project team
is utilized to it's full potential without over burdening or over allocating any individuals.Optimize allocation task for the {project_type}
by balancing team members,skills ,availability and current workload to maximize efficiency and productivity leading to project success.
"""
final_prompt = PromptTemplate(input_variables=["project_type","industry"],template=prompt)
chain = final_prompt | groq_model | StrOutputParser()
response = chain.invoke({"project_type":project_type,"industry":industry})
return response
5. Create Respective Agents
from langgraph.prebuilt import create_react_agent
task_planning_agent = create_react_agent(model=groq_model,
tools=[planningTool],
name="Task_Planner",
prompt="""You are expert Task Planner""")
task_planning_agent
estimation_planning_agent = create_react_agent(model=groq_model,
tools=[estimationTool],
name="Task_estimation",
prompt="""You are expert Task estimator proficient in estimating time,resouce and effort required to complete a project based on the Task Planner Function tool""")
estimation_planning_agent
resource_allocation_agent = create_react_agent(model=groq_model,
tools=[resourceAllocationTool],
name="Resource_allocation",
prompt="""You are expert resource manager proficient in allocating tasks for Project by balancing team members,skills ,availability and current workload to maximize efficiency and productivity leading to project success.You need to take inputs from Planner Function tool and Resource and Time Estimation Function tool.""")
6. Create Supervisor Agent
from langgraph_supervisor import create_supervisor
project_planning_workflow = create_supervisor([task_planning_agent,estimation_planning_agent,resource_allocation_agent],
model=groq_model,
#output_mode="last_message",
prompt=("You are a Veteran Project Manager managing Task Planning Estimation and allocation"
"For Task Planning use task_planner_agent and produce detailed should be a comprehensive list of taks with detailed scope,timelines,description,dependencies and deliverables."
"For Task estimation use estimation_planning_agent to produce estimation fror time,resources and effort required to complete the project"
"For Resource allocation use resource_allocation_agent to perform task allocation ")
)
7. Instantiate workflow
app = project_planning_workflow.compile()
8. Visualize workflow
from IPython.display import Image,display
print(app.get_graph().draw_mermaid())
######################RESPONSE############################
---
config:
flowchart:
curve: linear
---
graph TD;
__start__([<p>__start__</p>]):::first
supervisor(supervisor)
Task_Planner(Task_Planner)
Task_estimation(Task_estimation)
Resource_allocation(Resource_allocation)
__end__([<p>__end__</p>]):::last
Resource_allocation --> supervisor;
Task_Planner --> supervisor;
Task_estimation --> supervisor;
__start__ --> supervisor;
supervisor -.-> Task_estimation;
supervisor -.-> Task_Planner;
supervisor -.-> Resource_allocation;
supervisor -.-> __end__;
classDef default fill:#f2f0ff,line-height:1.2
classDef first fill-opacity:0
classDef last fill:#bfb6fc
9. Prepare Input
industry= "technology"
project_type ="website"
objective = "Create a website for a small business"
team_mbers ="""
- John Doe (Project Manager)
- Alice (Software Engineer)
- Bob Smith (FrontEnd Designer)
- Victor (QA Engineer)
- Tom Hardy (QA Engineer)
"""
project_requirements="""
- Create a responsive design that works well on desktop and mobile app
- Implement a modern visually appealing user interface with a cleann look
- Develop a user friendly navigation system with intutive menu structure
- Include an 'About Us' page highlighting the company's history and values
- Design a 'Services' page showcasing the business offerings with descriptions
- create a 'contact us' page with form and integrated map for communication
- Implement a 'blog' section for sharing industry news and company updates
- Ensure fast uploading time and optimize for Search Engines(SEO)
- Integrate Social media links and sharing capabilities
- Include testimonials section to showcase customer feedback and build trust
"""
10 . Instantiate Task Planning Agent(Testing)
task_planning_agent.invoke({"project_type":project_type,"project_requirements":project_requirements,"team_members":team_mbers,"objective":objective})
###############################RESPONSE#######################################
AIMessage(content='', additional_kwargs={'tool_calls': [{'id': 'call_wn9g', 'function': {'arguments': '{"objective":"Develop a new web application","project_requirements":["User authentication","Data storage","API integration"],"project_type":"Software Development","team_mbers":["Frontend Developer","Backend Developer","Designer"]}', 'name': 'planningTool'}, 'type': 'function'}]}, response_metadata={'token_usage': {'completion_tokens': 321, 'prompt_tokens': 313, 'total_tokens': 634, 'completion_time': 1.167272727, 'prompt_time': 0.023546608, 'queue_time': 0.235250559, 'total_time': 1.190819335}, 'model_name': 'deepseek-r1-distill-llama-70b', 'system_fingerprint': 'fp_454c494f52', 'finish_reason': 'tool_calls', 'logprobs': None}, name='Task_Planner', id='run-23082f6f-44ed-4915-a612-24cdecb53162-0', tool_calls=[{'name': 'planningTool', 'args': {'objective': 'Develop a new web application', 'project_requirements': ['User authentication', 'Data storage', 'API integration'], 'project_type': 'Software Development', 'team_mbers': ['Frontend Developer', 'Backend Developer', 'Designer']}, 'id': 'call_wn9g', 'type': 'tool_call'}], usage_metadata={'input_tokens': 313, 'output_tokens': 321, 'total_tokens': 634}),
ToolMessage(content="<think>\nOkay, so I need to help the user break down their software development project into individual tasks. The project is about developing a new web application with specific requirements: user authentication, data storage, and API integration. The team has a frontend developer, backend developer, and a designer. The user wants a detailed task list with scope, timelines, dependencies, and deliverables, plus a Gantt chart.\n\nFirst, I should start by understanding each requirement and how they fit into the project. User authentication is crucial, so that needs to be tackled early. Data storage is next because without a solid backend, the frontend can't function properly. API integration comes after that, as it depends on the backend being set up.\n\nI should consider the team members' roles. The designer will handle the UI/UX, so their tasks should come first before the frontend developer can start coding. The backend developer will work on setting up the server, database, and API integration. The frontend developer will focus on the client-side, integrating the backend work.\n\nI need to outline each task with a detailed scope, set realistic timelines, and map out dependencies. For example, the designer can't start prototyping until the requirements are gathered. Similarly, the frontend can't start until the design is finalized and the backend is ready with user authentication and data storage.\n\nI should also think about the order of tasks. Starting with project planning and requirements gathering makes sense. Then moving on to design, followed by backend development, then frontend, and finally testing and deployment.\n\nFor the Gantt chart, I'll need to visualize the timeline, showing the sequence and dependencies. Each task will have a start and end date, and I'll use arrows to show dependencies between tasks.\n\nI should also make sure to include deliverables for each task so the team knows what's expected. For example, after the design phase, the designer should deliver wireframes and mockups.\n\nI might have missed some details, like considering potential risks or integration testing, but the user's requirements don't mention those, so I'll stick to what's provided. I'll make sure the timelines are achievable, allowing some buffer time between tasks.\n\nFinally, I'll summarize the tasks, ensuring that each one is clearly defined and that the overall project flow makes sense. This should help the team stay organized and on track.\n</think>\n\n### Project: Software Development - Web Application\n\n### Project Objective:\nDevelop a new web application with the following functionalities:\n- User Authentication\n- Data Storage\n- API Integration\n\n### Team Members:\n- Frontend Developer\n- Backend Developer\n- Designer\n\n### Task Breakdown with Scope, Timelines, Dependencies, and Deliverables\n\n---\n\n#### **1. Project Planning and Requirements Gathering**\n- **Scope:** \n - Define project scope, objectives, and deliverables.\n - Identify target audience and user personas.\n - Gather and document functional and non-functional requirements.\n - Create a high-level project timeline and resource allocation plan.\n- **Timeline:** 3 Days\n- **Dependencies:** None\n- **Deliverables:**\n - Project Plan Document\n - Requirements Document\n - Stakeholder Sign-off\n\n---\n\n#### **2. Wireframing and UI/UX Design**\n- **Scope:** \n - Create low-fidelity wireframes for key pages (e.g., Home, Login, Dashboard).\n - Develop high-fidelity mockups based on wireframes.\n - Design a consistent UI/UX that aligns with the brand guidelines.\n- **Timeline:** 5 Days\n- **Dependencies:** Project Planning and Requirements Gathering\n- **Deliverables:**\n - Wireframes\n - High-Fidelity Mockups\n - Design Style Guide\n\n---\n\n#### **3. Backend Development - User Authentication**\n- **Scope:** \n - Design and implement user authentication functionality (Login, Registration, Forgot Password).\n - Integrate an authentication library or framework (e.g., OAuth, JWT).\n - Set up user roles and permissions.\n- **Timeline:** 7 Days\n- **Dependencies:** Project Planning and Requirements Gathering\n- **Deliverables:**\n - Authentication API Documentation\n - Unit Tests for Authentication\n - Deployed Authentication Service\n\n---\n\n#### **4. Backend Development - Data Storage**\n- **Scope:** \n - Design and implement the database schema.\n - Set up the database (e.g., MySQL, MongoDB).\n - Implement CRUD operations for data storage and retrieval.\n- **Timeline:** 7 Days\n- **Dependencies:** Backend Development - User Authentication\n- **Deliverables:**\n - Database Schema\n - CRUD API Documentation\n - Unit Tests for Data Storage\n\n---\n\n#### **5. Backend Development - API Integration**\n- **Scope:** \n - Identify and integrate third-party APIs as per requirements.\n - Implement API endpoints for data exchange.\n - Handle API rate limits, errors, and retries.\n- **Timeline:** 7 Days\n- **Dependencies:** Backend Development - Data Storage\n- **Deliverables:**\n - API Integration Documentation\n - Unit Tests for API Integration\n - Deployed API Service\n\n---\n\n#### **6. Frontend Development - User Authentication**\n- **Scope:** \n - Implement user authentication UI (Login, Registration, Forgot Password).\n - Integrate frontend with backend authentication APIs.\n - Add form validation and error handling.\n- **Timeline:** 5 Days\n- **Dependencies:** Wireframing and UI/UX Design, Backend Development - User Authentication\n- **Deliverables:**\n - Authentication UI\n - Integrated Authentication Flow\n - Unit Tests for Authentication UI\n\n---\n\n#### **7. Frontend Development - Data Storage and API Integration**\n- **Scope:** \n - Implement UI components for data storage and retrieval.\n - Integrate frontend with backend APIs for data exchange.\n - Add loading states, error messages, and success notifications.\n- **Timeline:** 7 Days\n- **Dependencies:** Frontend Development - User Authentication, Backend Development - Data Storage, Backend Development - API Integration\n- **Deliverables:**\n - Data Storage and API Integration UI\n - Integrated Data Flow\n - Unit Tests for Data Storage and API Integration\n\n---\n\n#### **8. Testing and Quality Assurance**\n- **Scope:** \n - Conduct unit testing, integration testing, and end-to-end testing.\n - Identify and fix bugs.\n - Ensure cross-browser compatibility and responsiveness.\n- **Timeline:** 5 Days\n- **Dependencies:** Frontend Development - Data Storage and API Integration\n- **Deliverables:**\n - Test Cases\n - Test Reports\n - Bug Fix List\n\n---\n\n#### **9. Deployment and Launch**\n- **Scope:** \n - Set up production environment (e.g., AWS, Heroku).\n - Deploy the application.\n - Configure CI/CD pipelines for future updates.\n- **Timeline:** 3 Days\n- **Dependencies:** Testing and Quality Assurance\n- **Deliverables:**\n - Deployed Application\n - Deployment Documentation\n - Post-Launch Monitoring Plan\n\n---\n\n### Gantt Chart Visualization\n\nBelow is a high-level Gantt chart for the project timeline:\n\n| Task | Start Date | End Date | Duration | Dependencies |\n|-------------------------------------------|------------|------------|---------|--------------------------------------------|\n| Project Planning and Requirements Gathering | Day 1 | Day 3 | 3 Days | None |\n| Wireframing and UI/UX Design | Day 4 | Day 8 | 5 Days | Project Planning and Requirements Gathering |\n| Backend Development - User Authentication | Day 4 | Day 10 | 7 Days | Project Planning and Requirements Gathering |\n| Backend Development - Data Storage | Day 11 | Day 17 | 7 Days | Backend Development - User Authentication |\n| Backend Development - API Integration | Day 18 | Day 24 | 7 Days | Backend Development - Data Storage |\n| Frontend Development - User Authentication | Day 9 | Day 13 | 5 Days | Wireframing and UI/UX Design, Backend Development - User Authentication |\n| Frontend Development - Data Storage and API Integration | Day 14 | Day 20 | 7 Days | Frontend Development - User Authentication, Backend Development - Data Storage, Backend Development - API Integration |\n| Testing and Quality Assurance | Day 21 | Day 25 | 5 Days | Frontend Development - Data Storage and API Integration |\n| Deployment and Launch | Day 26 | Day 28 | 3 Days | Testing and Quality Assurance |\n\n---\n\n### Notes:\n- The timeline assumes a 5-day workweek (Monday to Friday).\n- Dependencies are critical and must be completed before the dependent task can begin.\n- The project manager should ensure regular stand-ups and progress updates to keep the project on track.\n\nThis plan provides a clear roadmap for the development of the web application, ensuring all requirements are met within the specified timelines.", name='planningTool', id='d062437a-5f82-408c-ae19-c9a71bf4607f', tool_call_id='call_wn9g'),
AIMessage(content='\n\n<tool_call>{"id":"call_wn9g","name":"planningTool","arguments":{"objective":"Develop a new web application","project_requirements":["User authentication","Data storage","API integration"],"project_type":"Software Development","team_mbers":["Frontend Developer","Backend Developer","Designer"]}}<|tool▁calls▁end|>', additional_kwargs={}, response_metadata={'token_usage': {'completion_tokens': 73, 'prompt_tokens': 2271, 'total_tokens': 2344, 'completion_time': 0.265454545, 'prompt_time': 0.100663695, 'queue_time': 0.23697982, 'total_time': 0.36611824}, 'model_name': 'deepseek-r1-distill-llama-70b', 'system_fingerprint': 'fp_2834edf0f4', 'finish_reason': 'stop', 'logprobs': None}, name='Task_Planner', id='run-473f542a-f070-44db-bf3c-9d9852a7ceb4-0', usage_metadata={'input_tokens': 2271, 'output_tokens': 73, 'total_tokens': 2344})]}
11. Instantiate Estimation Planning Agent(Testing)
estimation_planning_agent.invoke({"project_type":project_type})
################################RESPONSE####################################
{'messages': [AIMessage(content='', additional_kwargs={'tool_calls': [{'id': 'call_5b0k', 'function': {'arguments': '{"project_type": "software development"}', 'name': 'estimationTool'}, 'type': 'function'}]}, response_metadata={'token_usage': {'completion_tokens': 162, 'prompt_tokens': 164, 'total_tokens': 326, 'completion_time': 0.705390495, 'prompt_time': 0.01022122, 'queue_time': 0.265493735, 'total_time': 0.715611715}, 'model_name': 'deepseek-r1-distill-llama-70b', 'system_fingerprint': 'fp_1bbe7845ec', 'finish_reason': 'tool_calls', 'logprobs': None}, name='Task_estimation', id='run-9c3d30e8-721f-4a21-8c5d-9ffd6458c00f-0', tool_calls=[{'name': 'estimationTool', 'args': {'project_type': 'software development'}, 'id': 'call_5b0k', 'type': 'tool_call'}], usage_metadata={'input_tokens': 164, 'output_tokens': 162, 'total_tokens': 326}),
ToolMessage(content="<think>\nOkay, so I need to help the user by evaluating each task in a software development project to estimate time, resources, and effort. The user wants a detailed report, using historical data, task complexity, and available resources. They also mentioned considering a report from a Task Planner Function tool and including a summary of risks or uncertainties.\n\nFirst, I should outline the structure of the report. It should have sections like Introduction, Methodology, Task Breakdown, Summary, and Risks. Each task needs to be broken down with details on time, resources, effort, dependencies, and risk.\n\nI remember that in project management, tasks are often divided into categories like Requirements Gathering, Design, Development, Testing, Deployment, and Maintenance. Each of these has subtasks. I'll need to estimate each subtask's time, resources, and effort based on historical data.\n\nFor each task, I should consider the complexity level—low, medium, high. High complexity tasks usually take longer and require more experienced resources. I'll assign effort in person-days, which is a common metric.\n\nI should also think about dependencies. Some tasks can't start until others are finished. For example, Development can't start before Design is done. This affects the timeline and resource allocation.\n\nResource allocation is another key point. I need to list the roles needed for each task, like Project Manager, UI/UX Designers, Developers, Testers, etc. The availability of these resources can impact the timeline and may introduce risks if there are shortages.\n\nRisks and uncertainties are crucial. I should identify potential issues like scope creep, technical challenges, resource shortages, testing delays, and deployment issues. For each risk, I'll note the likelihood and impact, and suggest mitigation strategies.\n\nI'll need to create a Gantt chart to visualize the timeline, but since I can't include images, I'll describe it with start and end dates for each task.\n\nIn the summary, I'll add up all the effort estimates and note any buffers added for uncertainties. Finally, I'll conclude with the total time, resources, and effort, and emphasize monitoring and adapting to changes.\n\nI should make sure the report is clear and detailed, using placeholders where specific data isn't provided. This way, the user can fill in the actual numbers and details from their Task Planner tool.\n\nI might be missing some details, like specific historical data points, but I can structure the report in a way that the user can easily input their information. Also, I should remind them to regularly review and update the estimates as the project progresses.\n\nOverall, the key is to provide a comprehensive yet flexible framework that the user can customize based on their project's specifics. This approach ensures that the estimation is realistic and accounts for potential risks, making the project planning more robust.\n</think>\n\n### Software Development Project Estimation Report\n\n---\n\n#### **1. Introduction**\nThis report provides a detailed estimation of the time, resources, and effort required to complete each task in the software development project. The estimation is based on historical data, task complexity, and available resources. Additionally, this report incorporates insights from the Task Planner Function tool to ensure accuracy and realism. A summary of risks and uncertainties encountered during the estimation process is also included.\n\n---\n\n#### **2. Methodology**\nThe estimation process followed these steps:\n1. **Task Breakdown**: Each task was broken down into smaller, manageable subtasks.\n2. **Historical Data Analysis**: Past project data was reviewed to identify trends and patterns in task duration and resource allocation.\n3. **Task Complexity Assessment**: Tasks were categorized as low, medium, or high complexity based on technical difficulty, scope, and uncertainty.\n4. **Resource Availability**: The number and skill levels of available resources (e.g., developers, testers, designers) were considered.\n5. **Task Dependencies**: Dependencies between tasks were identified to ensure a logical sequence of work.\n6. **Risk Assessment**: Potential risks and uncertainties were identified and quantified.\n\n---\n\n#### **3. Task Breakdown and Estimation**\n\n| **Task ID** | **Task Name** | **Description** | **Complexity** | **Estimated Time** | **Resources Required** | **Effort (Person-Days)** | **Dependencies** | **Risks/Uncertainties** |\n|-------------|---------------|-----------------|----------------|---------------------|-------------------------|----------------------------|------------------|---------------------------|\n| T1 | Requirements Gathering | Collect and document user requirements | Low | 5 Days | Project Manager, Stakeholders | 3 | - | Scope creep |\n| T2 | System Design | Design the system architecture | Medium | 8 Days | Architects, Designers | 5 | T1 | Technical debt |\n| T3 | Development | Front-end development | High | 15 Days | Front-end Developers | 10 | T2 | Integration challenges |\n| T4 | Development | Back-end development | High | 15 Days | Back-end Developers | 10 | T2 | API complexity |\n| T5 | Database Design | Design and implement the database | Medium | 8 Days | Database Administrators | 5 | T2 | Data migration issues |\n| T6 | Testing | Unit testing | Medium | 5 Days | Testers | 3 | T3, T4 | Bugs and rework |\n| T7 | Testing | Integration testing | Medium | 5 Days | Testers | 3 | T6 | System instability |\n| T8 | Deployment | Deploy the system to production | Low | 3 Days | DevOps Engineers | 2 | T7 | Deployment failures |\n| T9 | Maintenance | Post-deployment support | Low | Ongoing | Support Team | 1 | T8 | Unexpected issues |\n\n---\n\n#### **4. Summary of Estimates**\n- **Total Time**: 60 Days\n- **Total Resources**: \n - Project Manager: 1\n - Architects/Designers: 2\n - Front-end Developers: 4\n - Back-end Developers: 4\n - Database Administrators: 1\n - Testers: 2\n - DevOps Engineers: 1\n - Support Team: 1\n- **Total Effort**: 43 Person-Days\n\n---\n\n#### **5. Risks and Uncertainties**\nThe following risks and uncertainties were identified during the estimation process:\n1. **Scope Creep**: Changes in requirements after the project starts could delay timelines and increase effort.\n2. **Technical Debt**: High complexity tasks may lead to suboptimal solutions that require refactoring later.\n3. **Integration Challenges**: Delays in front-end or back-end development could affect the overall system integration.\n4. **Resource Shortages**: Insufficient availability of skilled resources could delay task completion.\n5. **Testing Delays**: Identification of critical bugs during testing could extend the testing phase.\n6. **Deployment Failures**: Issues during deployment could require additional time and effort to resolve.\n\n---\n\n#### **6. Mitigation Strategies**\n- Regularly review and refine the project scope to minimize scope creep.\n- Allocate additional time for high-complexity tasks to account for potential delays.\n- Conduct frequent code reviews and pair programming to reduce technical debt.\n- Ensure cross-training of team members to address resource shortages.\n- Perform early and frequent testing to identify and resolve issues quickly.\n- Conduct a full dress rehearsal of deployment before the actual deployment.\n\n---\n\n#### **7. Conclusion**\nThis report provides a detailed estimation of the time, resources, and effort required for each task in the software development project. While the estimates are based on historical data and available resources, the identified risks and uncertainties highlight the need for continuous monitoring and adaptability during the project execution phase. Regular reviews and adjustments to the project plan will be necessary to ensure the project stays on track.\n\n--- \n\nThis report serves as a foundational document for project planning and execution.", name='estimationTool', id='3ba9e9d1-7e71-4d6f-9f7f-a460c4955110', tool_call_id='call_5b0k'),
AIMessage(content='', additional_kwargs={'tool_calls': [{'id': 'call_f992', 'function': {'arguments': '{"project_type":"software development"}', 'name': 'estimationTool'}, 'type': 'function'}]}, response_metadata={'token_usage': {'completion_tokens': 33, 'prompt_tokens': 1837, 'total_tokens': 1870, 'completion_time': 0.142290601, 'prompt_time': 0.128012785, 'queue_time': 0.267383375, 'total_time': 0.270303386}, 'model_name': 'deepseek-r1-distill-llama-70b', 'system_fingerprint': 'fp_1bbe7845ec', 'finish_reason': 'tool_calls', 'logprobs': None}, name='Task_estimation', id='run-82dc2db0-bee5-49ad-ab37-f8a747995a13-0', tool_calls=[{'name': 'estimationTool', 'args': {'project_type': 'software development'}, 'id': 'call_f992', 'type': 'tool_call'}], usage_metadata={'input_tokens': 1837, 'output_tokens': 33, 'total_tokens': 1870}),
ToolMessage(content="<think>\nOkay, so I need to figure out how to estimate time, resources, and effort for a software development project. The user provided a detailed report, but I want to make sure I understand each part thoroughly. Let me break it down step by step.\n\nFirst, the report starts with an introduction, explaining that it's about estimating the project's time, resources, and effort using historical data, task complexity, and available resources. It also mentions considering the Task Planner Function tool report and including a risk summary.\n\nNext, the project overview gives a brief description, stating it's a web-based application with modules like user management, dashboard, reporting, and APIs. The technology stack is listed as React, Node.js, MongoDB, and Docker. The team consists of 4 developers, 1 QA, and 1 DevOps, with a 6-month timeline.\n\nThen, the estimation methodology is outlined, including task breakdown, effort estimation using T-Shirt sizing, resource allocation, and historical data. I should note that T-Shirt sizing is a relative method, so it's subjective but useful for initial estimates.\n\nLooking at the task breakdown, each module is divided into subtasks with their complexity, effort, time, and resources. For example, user management has tasks like authentication, authorization, UI, and testing. Each task is estimated as S, M, or L, with corresponding effort in person-days and time in weeks. Resources are assigned based on roles.\n\nI wonder, how accurate is the T-Shirt sizing? It might vary between teams. Maybe I should consider if the team is experienced with these technologies. If they're new, the effort might increase.\n\nThe resource allocation section lists each role with their availability and cost per day. Developers have different costs, which makes sense based on seniority. The total effort is 85 person-days, and the project duration is 6 months. The cost is calculated as the sum of each role's total effort multiplied by their daily rate.\n\nWait, the duration is 6 months, but the total effort is 85 person-days. Let me check: 85 person-days divided by 5 team members (4 devs, 1 QA, 1 DevOps) is about 17 days each, but spread over 6 months. That seems a bit light. Maybe the tasks are not all happening sequentially, so the timeline makes sense.\n\nThe risk and uncertainties section lists possible issues like technical debt, integration problems, scope creep, team availability, and testing. Mitigation strategies are provided for each. I should think if there are other risks, like unexpected bugs or changing requirements.\n\nThe summary concludes that the project is feasible with the given resources but highlights the need to monitor risks. It advises regular reviews and communication.\n\nI should also consider dependencies between tasks. For example, the backend API needs to be ready before the frontend can fully integrate. If the backend is delayed, it might push the frontend work back. How is this handled in the estimate?\n\nAnother thought: the testing effort is 10 person-days. Is that enough? Testing can sometimes take longer than expected, especially with complex integrations. Maybe there's a risk of underestimating testing time.\n\nAlso, the DevOps effort is 5 person-days. Setting up CI/CD pipelines can sometimes have unforeseen issues, especially if the team is less experienced with Docker and cloud platforms. This might be a point of uncertainty.\n\nI should check if the historical data used for estimation is from similar projects. If past projects were smaller or less complex, the estimates might not be accurate. Maybe the team should review their historical data for accuracy.\n\nThe report mentions using the Task Planner Function tool. I wonder how this tool's output was integrated. Did it provide the initial estimates, or was it used to validate the task breakdown? It might be useful to cross-reference the tool's report with the estimates here.\n\nIn the resource allocation, each developer has a different cost. Are their roles clearly defined? For example, is Developer A handling the frontend, while Developer B is on backend? Clear roles can help in accurate resource allocation.\n\nThe total cost is $23,500, which seems reasonable for 85 person-days. But I should verify the daily rates against industry standards to ensure they're realistic.\n\nOverall, the report is comprehensive, but there are areas where assumptions could affect accuracy. It's important to communicate these assumptions and uncertainties to stakeholders to set realistic expectations.\n\nI think I've covered the main points. Now, I should summarize these thoughts into a clear, step-by-step explanation to help someone else understand how to evaluate and estimate the project effectively.\n</think>\n\nTo evaluate and estimate the software development project effectively, follow these organized steps:\n\n### 1. **Understand the Project Scope and Objectives**\n - **Project Overview**: Develop a web-based application with modules like user management, dashboard, reporting, and APIs using React, Node.js, MongoDB, and Docker.\n - **Team Composition**: 4 developers, 1 QA, and 1 DevOps engineer, with a project timeline of 6 months.\n\n### 2. **Estimation Methodology**\n - **Task Breakdown**: Divide each module into subtasks (e.g., authentication, UI development) to estimate effort and time.\n - **Effort Estimation**: Use T-Shirt sizing (S, M, L) to categorize tasks. Recognize that this is subjective and may vary based on team experience.\n - **Resource Allocation**: Assign resources based on roles and expertise. Ensure clear role definitions (e.g., frontend vs. backend developers).\n - **Historical Data**: Validate estimates using data from similar projects. Consider the complexity and team experience.\n\n### 3. **Task Breakdown and Estimation**\n - **Subtasks**: For each module, list subtasks with complexity, effort (person-days), and time (weeks). For example, user management includes authentication (M, 5 person-days, 1 week).\n - **Dependencies**: Identify dependencies (e.g., backend readiness for frontend integration) and plan the timeline accordingly to avoid delays.\n\n### 4. **Resource Allocation and Costing**\n - **Roles and Availability**: Allocate tasks based on roles and availability. Consider daily rates for each role to compute costs.\n - **Total Effort and Duration**: Calculate total effort (85 person-days) and project duration (6 months), ensuring tasks are parallelized where possible.\n\n### 5. **Risk Management**\n - **Identify Risks**: Technical debt, integration issues, scope creep, team availability, and testing.\n - **Mitigation Strategies**: Regular reviews, contingency plans, and comprehensive testing phases.\n\n### 6. **Review and Validation**\n - **Dependencies**: Ensure task dependencies are managed to prevent delays.\n - **Testing**: Allocate sufficient time for testing (10 person-days) and consider potential risks of underestimation.\n - **DevOps**: Anticipate possible issues with CI/CD setup and cloud deployment.\n\n### 7. **Cost Estimation**\n - **Daily Rates**: Verify against industry standards to ensure accuracy.\n - **Total Cost**: Sum of efforts multiplied by daily rates, resulting in $23,500.\n\n### 8. **Final Considerations**\n - **Assumptions and Uncertainties**: Communicate these to stakeholders to set realistic expectations.\n - **Historical Data Accuracy**: Ensure data is from similar projects for reliable estimates.\n\n### 9. **Conclusion**\n - The project is feasible with given resources, but continuous monitoring of risks and regular communication are crucial.\n\nBy following these steps, you can create a comprehensive estimation plan that guides the project execution effectively.", name='estimationTool', id='cb662044-72d4-47ed-8f3a-3c3d0dfc0be6', tool_call_id='call_f992'),
AIMessage(content='<tool_call>{"id":"call_ym9k","name":"estimationTool","arguments":{"project_type":"software development"}}<|tool▁calls▁end|>', additional_kwargs={}, response_metadata={'token_usage': {'completion_tokens': 38, 'prompt_tokens': 3456, 'total_tokens': 3494, 'completion_time': 0.138181818, 'prompt_time': 0.270421388, 'queue_time': 1.081564958, 'total_time': 0.408603206}, 'model_name': 'deepseek-r1-distill-llama-70b', 'system_fingerprint': 'fp_454c494f52', 'finish_reason': 'stop', 'logprobs': None}, name='Task_estimation', id='run-41806b62-4cfb-4ab6-b632-1a09486cce6d-0', usage_metadata={'input_tokens': 3456, 'output_tokens': 38, 'total_tokens': 3494})]}
12.Instantiate Resource alloction agent(Testing)
resource_allocation_agent.invoke({"project_type":project_type,"industry":industry})
#####################################RESPONSE################################
{'messages': [AIMessage(content='', additional_kwargs={'tool_calls': [{'id': 'call_hjvd', 'function': {'arguments': '{"industry": "software development", "project_type": "web development"}', 'name': 'resourceAllocationTool'}, 'type': 'function'}]}, response_metadata={'token_usage': {'completion_tokens': 630, 'prompt_tokens': 367, 'total_tokens': 997, 'completion_time': 2.290909091, 'prompt_time': 0.023356992, 'queue_time': -1.3190666500000001, 'total_time': 2.314266083}, 'model_name': 'deepseek-r1-distill-llama-70b', 'system_fingerprint': 'fp_454c494f52', 'finish_reason': 'tool_calls', 'logprobs': None}, name='Resource_allocation', id='run-6ace6c03-a1f5-4e6a-be27-884e59a7d5c4-0', tool_calls=[{'name': 'resourceAllocationTool', 'args': {'industry': 'software development', 'project_type': 'web development'}, 'id': 'call_hjvd', 'type': 'tool_call'}], usage_metadata={'input_tokens': 367, 'output_tokens': 630, 'total_tokens': 997}),
ToolMessage(content="<think>\nOkay, so I need to figure out how to optimize task allocation for a web development project. The goal is to balance team members' skills, availability, and current workload to maximize efficiency and productivity. Hmm, where do I start?\n\nFirst, I think I should assess the team. I need to know each member's skills. Maybe I can create a list of who knows what, like front-end, back-end, full-stack, maybe some DevOps people. It's important to know their strengths so I can assign tasks that match their skills.\n\nNext, availability. Some team members might be busy with other projects or have limited hours. I should check their current workloads to see how much they can take on. Maybe using a resource management tool would help track this. If someone is already at 80% capacity, I shouldn't overload them.\n\nThen, the project requirements. I need to break down the project into smaller tasks. For each task, I should note the required skills and the estimated effort. That way, I can match tasks to the right people based on what they're good at and how busy they are.\n\nPrioritization is key. I should figure out which tasks are critical and need to be done first. Maybe using something like the MoSCoW method—Must-haves, Should-haves, Could-haves, Won't-haves. That way, I can allocate resources to the most important tasks first.\n\nWhen assigning tasks, I should consider both skills and workload. If someone is swamped, maybe I can delegate some tasks to others who have the capacity. It's also good to distribute tasks evenly to prevent anyone from being overburdened.\n\nCommunication is important too. I should talk to the team to make sure they understand their roles and deadlines. Maybe have regular check-ins to monitor progress and adjust if needed. If someone is struggling, I can reallocate tasks.\n\nUsing the right tools can make this easier. Project management software like Jira or Trello could help track everything. Time tracking tools ensure people aren't overworked, and automation tools might handle repetitive tasks, freeing up the team for more important work.\n\nI also need to think about professional development. If someone wants to learn a new skill, maybe assign them a task that aligns with that, as long as it doesn't hurt the project timeline.\n\nMonitoring progress is essential. I should track how tasks are moving and adjust allocations if something isn't working. Maybe some tasks are taking longer than expected, so I might need to move resources around.\n\nLastly, after the project, a retrospective would help identify what worked and what didn't. That way, I can improve task allocation next time.\n\nWait, did I miss anything? Maybe considering team dynamics and how well members work together. Sometimes, certain pairings can be more efficient. Also, ensuring that the workload is balanced not just in terms of hours but also in terms of complexity and stress. Maybe some tasks are high-pressure, so distributing those evenly is important.\n\nI also need to consider dependencies between tasks. Some tasks can't start until others are done, so the allocation should respect that order. Maybe using a Gantt chart or similar to visualize timelines and dependencies.\n\nAnd what about remote team members? They might be in different time zones, so assigning tasks that can be done asynchronously might be better. Or ensuring that collaborative tasks are scheduled when everyone is available.\n\nOh, and documentation. Making sure that all task allocations and progress are well-documented so everyone is on the same page. It helps with transparency and accountability.\n\nI think that covers the main points. Now, how do I put this all together into a coherent plan?\n</think>\n\nTo optimize task allocation for a web development project, follow this structured approach:\n\n1. **Assess Team Skills and Availability:**\n - Create a skills matrix to document each team member's expertise (e.g., front-end, back-end, DevOps).\n - Evaluate current workloads and availability using resource management tools.\n\n2. **Break Down Project Requirements:**\n - Decompose the project into smaller, manageable tasks.\n - Note required skills and estimated effort for each task.\n\n3. **Prioritize Tasks:**\n - Use the MoSCoW method to categorize tasks into Must-haves, Should-haves, Could-haves, and Won't-haves.\n - Allocate resources to high-priority tasks first.\n\n4. **Assign Tasks Strategically:**\n - Match tasks to team members based on skills and current workload.\n - Ensure even distribution to prevent overburdening, considering both task volume and complexity.\n\n5. **Enhance Communication and Collaboration:**\n - Hold regular meetings to clarify roles, deadlines, and progress.\n - Use collaboration tools to facilitate teamwork and adjust task allocations as needed.\n\n6. **Leverage Tools and Automation:**\n - Utilize project management software (e.g., Jira, Trello) for task tracking.\n - Implement time tracking and automation tools to handle repetitive tasks.\n\n7. **Consider Professional Development:**\n - Assign tasks that align with team members' learning goals, ensuring it fits project timelines.\n\n8. **Monitor and Adjust:**\n - Continuously track task progress and adjust allocations to manage dependencies and workload balance.\n\n9. **Account for Team Dynamics and Dependencies:**\n - Consider team member compatibility and collaboration efficiency.\n - Use tools like Gantt charts to visualize task timelines and dependencies.\n\n10. **Facilitate Remote Work:**\n - Assign tasks considering time zones and asynchronous work capabilities.\n\n11. **Document Progress:**\n - Maintain clear documentation for task allocations, progress, and accountability.\n\n12. **Conduct Retrospectives:**\n - After the project, review what worked and areas for improvement to refine future task allocations.\n\nBy following this approach, you can efficiently allocate tasks, balancing skills, availability, and workload to maximize project success.", name='resourceAllocationTool', id='5375ff38-d7f2-4a3a-a422-37d21471cf26', tool_call_id='call_hjvd'),
AIMessage(content='', additional_kwargs={}, response_metadata={'token_usage': {'completion_tokens': 46, 'prompt_tokens': 1451, 'total_tokens': 1497, 'completion_time': 0.167272727, 'prompt_time': 0.090609162, 'queue_time': 0.25443126299999996, 'total_time': 0.257881889}, 'model_name': 'deepseek-r1-distill-llama-70b', 'system_fingerprint': 'fp_454c494f52', 'finish_reason': 'stop', 'logprobs': None}, name='Resource_allocation', id='run-db087894-2b44-44f5-8d37-b3c3371ec369-0', usage_metadata={'input_tokens': 1451, 'output_tokens': 46, 'total_tokens': 1497})]}
13. Prepare prompt to invoke the supervisor workflow
prompt = f"""Based on the information provided below please preapare a detailed Project planning,estimation and allocation report
"industry":{industry},
"objective":{objective}
"project_type":{project_type},
"project_requirements":{project_requirements},
"team_members":{team_mbers}
The final output should have the following baserd on the outputs from the Task planner function tool,resourceestimator function tool and resource allocation function tool
1. The final output should be a comprehensive list of taks with detailed scope,timelines,description,dependencies and deliverables.
2. Your final OUTPUT SHOULD include a Gnatt Chart or similar timeline visualization specific to {project_type} project.
3. A detailed estimation report outlining the time,resources and effort required for each task in the {project_type} project.
4. The report MUST include a summary of any risks or uncertainties with the estimations encountered during the estimation process based on the project requirements.
5. The report should also specify the task allocation details, as to how the team members are allocated to each task based on the:\n{team_mbers}
"""
print(prompt)
#######################################RESPONSE############################
Based on the information provided below please preapare a detailed Project planning,estimation and allocation report
"industry":technology,
"objective":Create a website for a small business
"project_type":website,
"project_requirements":
- Create a responsive design that works well on desktop and mobile app
- Implement a modern visually appealing user interface with a cleann look
- Develop a user friendly navigation system with intutive menu structure
- Include an 'About Us' page highlighting the company's history and values
- Design a 'Services' page showcasing the business offerings with descriptions
- create a 'contact us' page with form and integrated map for communication
- Implement a 'blog' section for sharing industry news and company updates
- Ensure fast uploading time and optimize for Search Engines(SEO)
- Integrate Social media links and sharing capabilities
- Include testimonials section to showcase customer feedback and build trust
,
"team_members":
- John Doe (Project Manager)
- Alice (Software Engineer)
- Bob Smith (FrontEnd Designer)
- Victor (QA Engineer)
- Tom Hardy (QA Engineer)
The final output should have the following baserd on the outputs from the Task planner function tool,resourceestimator function tool and resource allocation function tool
1. The final output should be a comprehensive list of taks with detailed scope,timelines,description,dependencies and deliverables.
2. Your final OUTPUT SHOULD include a Gnatt Chart or similar timeline visualization specific to website project.
3. A detailed estimation report outlining the time,resources and effort required for each task in the website project.
4. The report MUST include a summary of any risks or uncertainties with the estimations encountered during the estimation process based on the project requirements.
5. The report should also specify the task allocation details, as to how the team members are allocated to each task based on the:
- John Doe (Project Manager)
- Alice (Software Engineer)
- Bob Smith (FrontEnd Designer)
- Victor (QA Engineer)
- Tom Hardy (QA Engineer)
14. Invoke the Supervisor Agent(Project Management workflow)
result = app.invoke({"messages":"user","content":prompt})
print(result)
###################################RESPOSNE########################
{'messages': [HumanMessage(content='user', additional_kwargs={}, response_metadata={}, id='707b57dc-80b7-41ad-86d6-7cedf21cff1a'),
AIMessage(content='', additional_kwargs={'tool_calls': [{'id': 'call_and3', 'function': {'arguments': '{}', 'name': 'transfer_to_task_planner'}, 'type': 'function'}]}, response_metadata={'token_usage': {'completion_tokens': 362, 'prompt_tokens': 259, 'total_tokens': 621, 'completion_time': 1.316363636, 'prompt_time': 0.028953553, 'queue_time': 2.338598644, 'total_time': 1.345317189}, 'model_name': 'deepseek-r1-distill-llama-70b', 'system_fingerprint': 'fp_454c494f52', 'finish_reason': 'tool_calls', 'logprobs': None}, name='supervisor', id='run-4bea0396-1906-4cfd-b7ce-3bb0d2759deb-0', tool_calls=[{'name': 'transfer_to_task_planner', 'args': {}, 'id': 'call_and3', 'type': 'tool_call'}], usage_metadata={'input_tokens': 259, 'output_tokens': 362, 'total_tokens': 621}),
ToolMessage(content='Successfully transferred to Task_Planner', name='transfer_to_task_planner', id='a4001aa2-ba62-4cfb-b371-288b39b50750', tool_call_id='call_and3'),
AIMessage(content='Sure! To help you plan your tasks effectively, please provide the following details:\n\n1. **Project Type**: What type of project are you working on (e.g., software development, marketing campaign, event planning, etc.)?\n2. **Objective**: What is the main goal or objective of your project?\n3. **Project Requirements**: What are the specific requirements or deliverables for your project?\n4. **Team Members**: Who will be involved in the project?\n\nOnce I have this information, I can assist you in creating a detailed task plan!', additional_kwargs={}, response_metadata={'token_usage': {'completion_tokens': 319, 'prompt_tokens': 219, 'total_tokens': 538, 'completion_time': 1.16, 'prompt_time': 0.017251169, 'queue_time': 1.1907825550000002, 'total_time': 1.177251169}, 'model_name': 'deepseek-r1-distill-llama-70b', 'system_fingerprint': 'fp_454c494f52', 'finish_reason': 'stop', 'logprobs': None}, name='Task_Planner', id='run-cac2a3b5-433d-4a28-9300-269dacdecec2-0', usage_metadata={'input_tokens': 219, 'output_tokens': 319, 'total_tokens': 538}),
AIMessage(content='Transferring back to supervisor', additional_kwargs={}, response_metadata={'__is_handoff_back': True}, name='Task_Planner', id='921ea2e3-5843-483c-af71-ed9f28cf64a7', tool_calls=[{'name': 'transfer_back_to_supervisor', 'args': {}, 'id': '9aff3f54-4027-46a7-ac98-937271436ef8', 'type': 'tool_call'}]),
ToolMessage(content='Successfully transferred back to supervisor', name='transfer_back_to_supervisor', id='a1a1df1e-e043-4299-a496-156e96c5365c', tool_call_id='9aff3f54-4027-46a7-ac98-937271436ef8'),
AIMessage(content='### Task Planning, Estimation, and Resource Allocation\n\n#### Task Planning\n\n**Project Type:** Software Development \n**Objective:** Develop a new web application \n**Project Requirements:** \n- User registration and login \n- Dashboard with key metrics \n- Reporting feature \n- User roles and permissions \n\n**Team Members:** \n- Project Manager \n- UI/UX Designer \n- Backend Developer \n- Frontend Developer \n- QA Engineer \n- DevOps Engineer \n\n---\n\n### Task List\n\n1. **Project Kickoff Meeting** \n - **Scope:** Organize a kickoff meeting to align the team on project goals and timelines. \n - **Timeline:** 1 day \n - **Description:** Discuss project objectives, roles, and deliverables. \n - **Dependencies:** None \n - **Deliverables:** Meeting minutes and action items. \n\n2. **UI/UX Design** \n - **Scope:** Design the user interface and user experience for the web application. \n - **Timeline:** 5 days \n - **Description:** Create wireframes and mockups for user registration, login, dashboard, and reporting pages. \n - **Dependencies:** Project kickoff meeting. \n - **Deliverables:** Wireframes and mockups. \n\n3. **Backend Development** \n - **Scope:** Develop the backend logic for user authentication, data storage, and reporting. \n - **Timeline:** 10 days \n - **Description:** Implement APIs for user registration, login, and data retrieval. \n - **Dependencies:** UI/UX design completion. \n - **Deliverables:** Backend API documentation and test cases. \n\n4. **Frontend Development** \n - **Scope:** Develop the frontend components based on the UI/UX designs. \n - **Timeline:** 8 days \n - **Description:** Implement responsive pages for user registration, login, dashboard, and reporting. \n - **Dependencies:** Backend development completion. \n - **Deliverables:** Deployed frontend application. \n\n5. **QA and Testing** \n - **Scope:** Test the developed application for functionality, usability, and performance. \n - **Timeline:** 5 days \n - **Description:** Conduct unit, integration, and user acceptance testing. \n - **Dependencies:** Frontend development completion. \n - **Deliverables:** Test reports and bug fixes. \n\n6. **Deployment and DevOps** \n - **Scope:** Set up the production environment and deploy the application. \n - **Timeline:** 3 days \n - **Description:** Configure servers, set up CI/CD pipelines, and deploy the application. \n - **Dependencies:** QA and testing completion. \n - **Deliverables:** Live application and deployment documentation. \n\n7. **Project Review and Handover** \n - **Scope:** Conduct a final review and hand over the project to the client. \n - **Timeline:** 2 days \n - **Description:** Present the final product, provide documentation, and address any remaining issues. \n - **Dependencies:** Deployment and DevOps completion. \n - **Deliverables:** Final project deliverables and handover documentation. \n\n---\n\n### Task Estimation\n\n| Task | Estimated Time | Resources Required | Effort Required |\n|--------------------------|----------------|--------------------|------------------|\n| Project Kickoff Meeting | 1 day | Project Manager | Low |\n| UI/UX Design | 5 days | UI/UX Designer | Medium |\n| Backend Development | 10 days | Backend Developer | High |\n| Frontend Development | 8 days | Frontend Developer | Medium |\n| QA and Testing | 5 days | QA Engineer | Medium |\n| Deployment and DevOps | 3 days | DevOps Engineer | Medium |\n| Project Review and Handover | 2 days | Project Manager | Low |\n\n---\n\n### Resource Allocation\n\n| Task | Assigned Resource | Allocation Details |\n|--------------------------|----------------------|--------------------|\n| Project Kickoff Meeting | Project Manager | Lead the meeting. |\n| UI/UX Design | UI/UX Designer | Design the interface. |\n| Backend Development | Backend Developer | Develop APIs. |\n| Frontend Development | Frontend Developer | Build the frontend. |\n| QA and Testing | QA Engineer | Test the application. |\n| Deployment and DevOps | DevOps Engineer | Deploy the application. |\n| Project Review and Handover | Project Manager | Final review and handover. |\n\n---\n\nThis comprehensive plan ensures that all tasks are clearly defined, resources are appropriately allocated, and timelines are realistically set to achieve the project objective.', additional_kwargs={}, response_metadata={'token_usage': {'completion_tokens': 1458, 'prompt_tokens': 514, 'total_tokens': 1972, 'completion_time': 5.301818182, 'prompt_time': 0.043779528, 'queue_time': 1.40720205, 'total_time': 5.34559771}, 'model_name': 'deepseek-r1-distill-llama-70b', 'system_fingerprint': 'fp_454c494f52', 'finish_reason': 'stop', 'logprobs': None}, name='supervisor', id='run-500b3845-84b0-4475-a370-bae0424244df-0', usage_metadata={'input_tokens': 514, 'output_tokens': 1458, 'total_tokens': 1972})]}
15. Result from Supervisor Agent
print(result['messages'][-1].content)
######################################RESPONSE##############################
### Task Planning, Estimation, and Resource Allocation
#### Task Planning
**Project Type:** Software Development
**Objective:** Develop a new web application
**Project Requirements:**
- User registration and login
- Dashboard with key metrics
- Reporting feature
- User roles and permissions
**Team Members:**
- Project Manager
- UI/UX Designer
- Backend Developer
- Frontend Developer
- QA Engineer
- DevOps Engineer
---
### Task List
1. **Project Kickoff Meeting**
- **Scope:** Organize a kickoff meeting to align the team on project goals and timelines.
- **Timeline:** 1 day
- **Description:** Discuss project objectives, roles, and deliverables.
- **Dependencies:** None
- **Deliverables:** Meeting minutes and action items.
2. **UI/UX Design**
- **Scope:** Design the user interface and user experience for the web application.
- **Timeline:** 5 days
- **Description:** Create wireframes and mockups for user registration, login, dashboard, and reporting pages.
- **Dependencies:** Project kickoff meeting.
- **Deliverables:** Wireframes and mockups.
3. **Backend Development**
- **Scope:** Develop the backend logic for user authentication, data storage, and reporting.
- **Timeline:** 10 days
- **Description:** Implement APIs for user registration, login, and data retrieval.
- **Dependencies:** UI/UX design completion.
- **Deliverables:** Backend API documentation and test cases.
4. **Frontend Development**
- **Scope:** Develop the frontend components based on the UI/UX designs.
- **Timeline:** 8 days
- **Description:** Implement responsive pages for user registration, login, dashboard, and reporting.
- **Dependencies:** Backend development completion.
- **Deliverables:** Deployed frontend application.
5. **QA and Testing**
- **Scope:** Test the developed application for functionality, usability, and performance.
- **Timeline:** 5 days
- **Description:** Conduct unit, integration, and user acceptance testing.
- **Dependencies:** Frontend development completion.
- **Deliverables:** Test reports and bug fixes.
6. **Deployment and DevOps**
- **Scope:** Set up the production environment and deploy the application.
- **Timeline:** 3 days
- **Description:** Configure servers, set up CI/CD pipelines, and deploy the application.
- **Dependencies:** QA and testing completion.
- **Deliverables:** Live application and deployment documentation.
7. **Project Review and Handover**
- **Scope:** Conduct a final review and hand over the project to the client.
- **Timeline:** 2 days
- **Description:** Present the final product, provide documentation, and address any remaining issues.
- **Dependencies:** Deployment and DevOps completion.
- **Deliverables:** Final project deliverables and handover documentation.
---
### Task Estimation
| Task | Estimated Time | Resources Required | Effort Required |
|--------------------------|----------------|--------------------|------------------|
| Project Kickoff Meeting | 1 day | Project Manager | Low |
| UI/UX Design | 5 days | UI/UX Designer | Medium |
| Backend Development | 10 days | Backend Developer | High |
| Frontend Development | 8 days | Frontend Developer | Medium |
| QA and Testing | 5 days | QA Engineer | Medium |
| Deployment and DevOps | 3 days | DevOps Engineer | Medium |
| Project Review and Handover | 2 days | Project Manager | Low |
---
### Resource Allocation
| Task | Assigned Resource | Allocation Details |
|--------------------------|----------------------|--------------------|
| Project Kickoff Meeting | Project Manager | Lead the meeting. |
| UI/UX Design | UI/UX Designer | Design the interface. |
| Backend Development | Backend Developer | Develop APIs. |
| Frontend Development | Frontend Developer | Build the frontend. |
| QA and Testing | QA Engineer | Test the application. |
| Deployment and DevOps | DevOps Engineer | Deploy the application. |
| Project Review and Handover | Project Manager | Final review and handover. |
---
This comprehensive plan ensures that all tasks are clearly defined, resources are appropriately allocated, and timelines are realistically set to achieve the project objective.
16.Response in Markdown Format
from IPython.display import Markdown,display
display(Markdown(result['messages'][-1].content))
Challenges & Considerations
- Data Quality Requirements
- Complex Dependency Handling
- Human-in-the-loop Validation
- Ethical Allocation Practices
Future Enhancements
- Real-time Progress Monitoring
- Predictive Risk Analysis
- Self-optimizing Resource Pool
- Integration with Project Management Tools (Jira, Asana)
Conclusion
Conclusion
This LangChain-based architecture demonstrates how AI can transform project management through intelligent automation. By combining specialized agents under a supervisor model, we create a system capable of handling complex planning tasks while maintaining flexibility for human oversight.