How St. Luke’s Hospital Downsized On Energy Costs & Upsized On Patient Healing & Safety

St. Lukes Hospital, Twin Falls, ID, USA: A Controls System Case Study

Belnor Engineering
THE BELNOR BLOG
2 min readJul 31, 2019

--

St. Luke’s Hospital, Twin Falls, ID, USA
Listen to this and other articles from #THEBELNORBLOG with our partner, The SustainabilityX™ Magazine, on Apple Podcasts, Spotify, and wherever you get your podcasts.

Essentially the sole healthcare facility in the area, St. Luke’s found its existing hospital unable to meet the growing needs of the community it served. Nearly $200 million was invested for a new facility — a high-performance building that would “promote maximum patient comfort and quality patient care.”

The Situation

This was an opportunity for St. Luke’s to start fresh and create a safer healing environment and a high-performance building with a layout designed for optimal working conditions and effectiveness. To achieve these goals, flexibility was a key factor in design considerations. The design team wanted the right technology in place to create a versatile building that could adapt to changes and grow with them; while maintaining patient safety, pandemic readiness, and energy efficiency.

The Solution

Engineering, Inc. was selected as the mechanical engineer for the project. The latest healthcare indoor air quality (IAQ) and ventilation standards warranted a new approach to controllability, accountability, and reliability. Engineering, Inc. chose venturi valves and control systems as the best products to meet these new demands.

The Result

VAV systems allowed energy-saving solutions for complicated problems such as lowering airflow while achieving min/max heating and cooling loads for patient towers facing both East and West. In total, 1,289 venturi valves were used on the project. To achieve their flexibility goal, VAV systems were also designed into spaces throughout the facility; including lobbies, kitchens, CTs, MRIs, ORs, as well as the MSTI Cancer Institute.

In total, 1,289 venturi valves were used on the project.

The VAV systems not only provided a safe environment and reliable energy savings but also allowed the engineering team to downsize the required HVAC equipment — saving on the project’s initial cost and reducing the start-up cost/time necessary to balance the building.​​​

This post was brought to you by Belnor Engineering.

Belnor Engineering, home of the Belnor IAQ Warden™, is the official multiple consecutive award-winning distributor of innovative architectural products around the globe. At the forefront of sustainability for over three decades, we specialize in laboratory & building automation & controls, IAQ & HVAC systems, renewable energy & architectural solutions, technical services, and green & healthy building consulting — building green cities one green building at a time. For more information, contact us. Don’t forget to read our Sustainability Manifesto: Decade Of 2020 while you’re at it. Cheers!

--

--

Belnor Engineering
THE BELNOR BLOG

Official Twitter of Belnor Engineering. Building green #cities one #greenbuilding at a time. #BelnorBuildsGreen. #CleanTech. #TheBelnorBlog. Mag: @SustXMagazine