Greg ZozulaRemote Room Project UpdateOne of my current design projects has moved into the next phase and the DC switchgear and circuit breakers were delivered to the remote…Feb 4, 2019Feb 4, 2019
Greg Zozula500 kVA Generator DeliveryYesterday I was on-site for the delivery of a 500 kVA generator for one of my design projects. The generator arrived behind schedule due…Dec 28, 2018Dec 28, 2018
Greg ZozulaBrookfield Safe Harbor Water Power Generation PlantToday I was able to visit Brookfield Safe Harbor Water Power Generation Plant. Brookfield is currently renovating one of the 25 hertz…Oct 17, 2018Oct 17, 2018
Greg ZozulaTrainOps DC Traction Power Network SimulationToday was the final day of TrainOps training at LTK Engineering Services headquarters. The training was for the software modeling program…Oct 11, 2018Oct 11, 2018
Greg Zozula64 Circuit TestingThis is a follow up blog to my blog about designing a 64 circuit for an open air dc switchgear. The construction of the 64 circuit has been…Jun 21, 20181Jun 21, 20181
Greg ZozulaGenerator Testing ProcedureToday I went to several transformer rooms to verify the 4.8 kV ac cables in each room. The cable numbers are needed to request a power…Jun 19, 20181Jun 19, 20181
Greg ZozulaElectric Vehicle ProjectToday I was on-site checking the status of one of my design projects. This project involved the layout and power requirements for…Jun 14, 20182Jun 14, 20182
Greg Zozula500 kVA GeneratorOne of my generator design projects is currently in the construction phase. This design will provide emergency power to a maintenance…Jun 12, 20185Jun 12, 20185
Greg Zozula7-Eleven Request For 400A 208/120 Volt 3-Phase ServiceA request was made to the power department to see if we could provide a 400A 208/120 volt 3-phase service for 7-Eleven. Unfortunately there…Jun 7, 20181Jun 7, 20181
Greg ZozulaRemote Room Project Part 2This blog is a follow up to my last blog regarding the remote room project I’m working on. I’m providing photos to help understand my last…Jun 4, 20184Jun 4, 20184