Cleveland Bridge will remain closed to HGVs but will re-open to vehicles under two metres in width from today.
We have made progress with resurfacing the bridge and concrete repairs have been made in the galleries. We are now…
While we were unable to undertake the waterproofing operation last week as planned, we were still busy with…
While much of the work done on Cleveland Bridge to date has been essential for structural resilience, we also…
The bridge is now open for pedestrians and cyclists following a temporary closure to cyclists and emergency…
Over the last two weeks we have undertaken some crucial repair work to the concrete supporting structure. While not…
As the bridge has been closed this week to emergency vehicles, we have been able to start more significant repairs…
While we have continued with breaking out concrete defects below the bridge during last week, we have also begun the…
Works to repair Cleveland Bridge are continuing with removal of the damaged concrete supporting the deck and a…
In the last week we carried out a thorough inspection of the concrete trusses and the process of breaking out the…