7th Part: Examples of tasks requiring PTW / 7.4 Second Part safety precautions

5Ssoftwaresafety
5S HEALTH AND SAFETY
3 min readOct 4, 2020

the IInd part related to the safety precautions

*I will explain this part, which personel protective equipment must be use.

  • Personel protective equipment should be selected considering types of hazardous

As a result of this, PPE we will use depend on work condition.

  • Nextly, performing authority side should all required actions working place and operating side should be inspected.

1.The Permit to Work procedure should be used and issuing authority side shall be inspected :

2.identifies the work that is to be completed

3.ensures that all potentially hazardous work is controlled and properly authorised;

4.Identify the hazards associated with the work;

5.Specify the necessary safety precautions (risk control measures) that must be implemented to manage the riskwhile the work is being completed; and,

Who is Issuing Authority:

Issuing Authority

Shall ensure that:

Person who has the power to authorise the commencing of the task and has the overall responsibility about the job to be performed.

All work requiring a PTW is identified;

The PTWs contain a clear description of the work to be done, its location, start time and duration;

Permits for work activities that may interact or affect other site activity are adequately controlled;

Sufficient information is given to oncoming shifts about work for which there is a permit and has not been completed;

All personnel (including contractors) working within the PTW system have sufficient knowledge and competence to carry out their duties;

Daily coordination meeting is held.

Give Work Permit No & Issue Date

5S SAFETY HANDBOOK

My publication will take about 2 hour with reading totally. I have divided my publication into seven parts.

1st Part: Natural Requirement of a Work Permit. I will give a few basic definitions regarding to permit to work system.

2nd Part: Formal Ways Definition

3th Part: When is PTW required ?

4th Part: Permit to Work Family !

5th. Part: Simultaneous Operations (You are here)

6th Part: Examples of tasks requiring PTW (You are here this part)

6.1 Cold Work Permit

6.2 Hot Work Permit

6.3 The Radiography Work Permit

6.4 Confined Spaces Work Permit

6.5 Excavation Work Permit

6.6 Hazard Energies Isolation Certificate & Lock-Out- Tag-Out (LO-TO)

6.7 Grating/Handrail Removal & Open Hole Certificate for Construction

6.8 Working At Height Work Permit

7 th Part: I give you some facts and figures regarding to practicle example PTW and How we can organize Permit to Work Systems

7.1 Toolbox Talk (You are reading here)

7.2 RA/JSA and How to fill Job Safety Analysis

7.3 Essentials Parts of PTW — How to Fill First Part PTW Document

7.3 How to Monitor PTW System on field ? — First Part PTW Document Location

7.4 Essentials Parts of PTW — Second Part safety precautions (You are reading here)

7.5 Essentials Parts of PTW Third part related to the issuing, starting and closure of the document

7.6 Display Permit to Work Papers

--

--