Permit to Work (PTW) Safety System Training — Part 6 Examples of tasks requiring PTW

5Ssoftwaresafety
5S HEALTH AND SAFETY
4 min readOct 3, 2020

What I want to show you, cold work permit simple package

Simple Cold Work Permit Package

1st: Filled Out Cold Work Permit

( Top Side: Logo, Work Permit Name, Work Permit No, Issue Date. Medium Side:Company, Area of Work, Starting Date and Hour, Working Ending Date and Hour, Descrtiption Of Work, Equipment To Used, Originating Authority, Performing Authority..)

2nd Filled Out CERTIFICATE — Excavation Work Permit

3th: PREPARE JSA

All subcontractor authority and performing side must sign !

4th: VERIFY DOCUMENT

ADDITIONAL DOCUMENT SUCH AS DRIVING LICENCE (OPERATOR), PERIODIC CONTROL HEAVY CERTIFICATE MACHINES..

5th Area Layout — And Project Procedure Drawing

You need to show which location you work and engineering drawing

Permit To Work (PTW) Written permission given to carry out work

TOTALLY !

COLD WORK PERMIT PACKAGE FOR EXCAVATION WORKS

CONFINED SPACE WORK PERMIT AND CERTIFICATE IMPORTANCE

Lets we see analysis why a lot of documents are necessary !

Let’s now take a look at what is certificates.
Certificates are additional form to be issued together with the Permit to Work for specific works in order to better identify and manage their related risk

For example, we are planning to welding operation inside tank, we must need hot permit to work because welding is that working types of hot work, also we work inside confined area. Before our working activity we must check before which type activity was performed ? Only 6 hours ago, other team (painting team) was doing spray painting. If we dont know previous working task, fire will exist immediately inside confined space due to welding operations

Confıned Space certificate should be attached with hot work.

Signed by authorized engineers, must always be combined with Cold Work Permit or Hot Work Permit or Radiography permit.

5S SAFETY HANDBOOK FREE DOWNLOAD LINK IS HERE

5S SAFETY HANDBOOK

My publication will take about 2 hour with reading totally. I have divided my publication into seven parts.

1st Part: Natural Requirement of a Work Permit. I will give a few basic definitions regarding to permit to work system.

2nd Part: Formal Ways Definition

3th Part: When is PTW required ?

4th Part: Permit to Work Family !

5th. Part: Simultaneous Operations (You are here)

6th Part: Examples of tasks requiring PTW (You are here)

6.1 Cold Work Permit

6.2 Hot Work Permit

6.3 The Radiography Work Permit

6.4 Confined Spaces Work Permit

6.5 Excavation Work Permit

6.6 Hazard Energies Isolation Certificate & Lock-Out- Tag-Out (LO-TO)

6.7 Grating/Handrail Removal & Open Hole Certificate for Construction

6.8 Working At Height Work Permit

7 th Part: I give you some facts and figures regarding to practicle example PTW and How we can organize Permit to Work Systems

7.1 Toolbox Talk

7.2 RA/JSA and How to fill Job Safety Analysis

7.3 Essentials Parts of PTW — First Part PTW Document

7.4 How to Monitor PTW System on field ? — First Part PTW Document Location

7.5 Essentials Parts of PTW — Second Part safety precautions

7.6 Essentials Parts of PTW Third part related to the issuing, starting and closure of the document

7.7 PTW REVALIDATION — Handover

7.8 Display Permit to Work Paper

7.9 Simple Flowchart Permit To Work Systems

7.10 Management Responsibilities &Site Responsibilities

--

--