Permit to Work (PTW) Safety System Training — Part 4 Permit to Work Family !
This flowchart presents us types of ptw, certificates and its attachment documents.
2.The present procedure considers following permits and certificates:
3.Especially risk assessment report and method statement are very important.
4.The Toolbox talk, and the JSA shall be attached to the copy of the PTW on site, other documentation shall be defined basing on the type of working activity.
5.Do you know PTW types?
6.Permit to work types are; hot work, cold work and radiography etc.
7.Related certifications, periodical inspection reports or plans (lifting, excavation, emergency, etc.) are attached to PTW if required.
LAYOUT AND COLOUR OF PERMITS
I’d like to update you on LAYOUT AND COLOUR OF PERMITS.
The Permits to Work are in A4 format and for visibility purposes, to aid identification of documents, different colours are used on the border’s
5S SAFETY HANDBOOK FREE DOWNLOAD LINK IS HERE
My publication will take about 2 hour with reading totally. I have divided my publication into seven parts.
2nd Part: Formal Ways Definition
3th Part: When is PTW required ?
4th Part: Permit to Work Family (You are here)
5th. Part: Simultaneous Operations
6th Part: Examples of tasks requiring PTW
7 th Part: I give you some facts and figures regarding to practicle example PTW and How we can organize Permit to Work Systems